Orange County NC Website
35 <br /> Slide #11 <br /> BOND STRATEGIES <br /> Issues with Consolidation <br /> CES site not suitable for consolidation s90R0(,, <br /> Current CES capacity = 447* (Woolpert) <br /> Addition (new wing) would add capacity ' <br /> �7ETIi A <br /> a Largest current OCS school is 588* <br /> • Creek runs behind playground <br /> • Elevation change, steep slope Issues to Consider <br /> • Lack of space to expand parking <br /> • Traffic flow, e.g. car riders Numerous <br /> a HES 365 out of 438 enrolled consolidation at CES site: <br /> • Land use <br /> CES 113 out of 291 enrolled * Capacity <br /> NOTE:Traditional calendar at Central Elementary, <br /> year-round calendar at Hillsborough Elementary <br /> ENGAGE. CHALLENGE. INSPIRE- <br /> Dwayne Foster said the Woolpert Study recommended consolidation and the district had <br /> some concerns and issues with that recommendation. He discussed the issues on slide #11. <br /> Slide #12 <br /> o <br /> ` JNU'.4 4+� <br /> ■ Fall <br /> Dwayne Foster showed the location of the creek and the elevation changes. <br />