Orange County NC Website
b <br /> Reporting/Record Keeoine <br /> The County will be able to maintain records of all data required by the Town and to provide a Monthly <br /> Project Report that includes: <br /> • Monthly Weights—Actuil weights will be provided that does not contain estimates, <br /> projections,or calculations,because this truck will collect only Hillsborough commercial <br /> waste. The truck will be dedicated to only Town collection services with no commingling of <br /> other non-Town wastes. Weights will be accurate and reliable. <br /> • List of customer complaints that include requested data, including how resolved. <br /> • List of extra collections or other substantive changes in services. <br /> • Full month reporting(1"-end). <br /> The County proposes to submit an annual summary of monthly billings for all services rendered,however, <br /> we will provide more frequent information or information relative to specific accounts as requested by the <br /> Town. <br /> B.Describe the firm's experience in the collection of commercial dumpsters and list a minimum of three <br /> (3)references with telephone numbers. <br /> The Solid Waste Management Department(and its predecessor governmental sub-unit)has been <br /> responsible for governmental commercial refuse and recycling collections for many years(at least the early <br /> 1900's). Until about 1996 Solid Waste Management Department collected(as a division within the Town <br /> of Chapel Hill Public Works Department)virtually all residential and commercial wastes within the Town <br /> of Chapel Hill. The Department also has extensive commercial recycling experience throughout all of the <br /> incorporated and unincorporated areas of the County since 1988. <br /> References: <br /> Cal Horton,Chapel Hill Town Manager 968-2743 <br /> Bob Morgan,Carrboro Town Manager 918-7315 <br /> Bruce Heflin,Chapel Hill Public Works Director 968-2796 <br /> C.List collection equipment and all accessories by type, model,and year of manufacture to be used in this <br /> proposal. Manufacturer delivery guarantees shall be attached to the submitted bid If the selected <br /> equipment is not available at any time during the tenure of the contract, the Contractor must provide <br /> alternate equipment to perform the work on the specified schedule. The Contractor shall list the <br /> contingency equipment available in case of equipmentfailure of the specified equipment. <br /> Currently available equipment: <br /> Roll-off Service(both trucks willbe available for orimary or contingency as neeessarv) <br /> • 2002 Freightliner Model FKD 120645/Swap Loader Model 655 Roll-off Truck <br /> • 1999 Mack Model RD 6885/Swap Loader Model 655 Roll-off Truck <br /> Front-Loader Service <br /> • 1997 Mack Model MR 6905/McNeilus Model 4020 Front Loader(will revert to contingency status <br /> when replaced,as scheduled,by new 2003 Front-Loader in FY 2002/03 Budget) <br /> • 2nd New Front Loader to be purchased in FY 2002/03 Budget if county awarded Hillsborough Bid. <br /> Truck cannot be order until bid award made so no delivery guarantee is possible at this time. <br /> 3 <br />