Browse
Search
Agenda - 04-20-2004-9c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 04-20-2004
>
Agenda - 04-20-2004-9c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:13:50 AM
Creation date
8/29/2008 10:40:56 AM
Metadata
Fields
Template:
BOCC
Date
4/20/2004
Document Type
Agenda
Agenda Item
9c
Document Relationships
Minutes - 20040420
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L~ocumen[ <br />Yage i of 5 <br />Involve maintenance personnel in the final approval and walkthrough stage ~f <br />Building Commissioning <br />Review of all operating systems <br />Review of projected energy use <br />Collaborative effort with owner, contractor and architect <br />Designed For Safety <br />Design allows for observation and entry control <br />Design allows technology surveillance <br />Provide single entry points for visitors <br />Design visible pazking areas from administrative offices <br />Design lock down points for emergencies <br />Encourage Community Centers <br />Design media centers, mufti-purpose areas, art rooms and cafeterias that are accessible to the public <br />Provide adequate parking for visitors <br />Provide Stimulating Architecture <br />Create a sense of pride by the school community <br />Provide a focal point for the community <br />Lift teacher, student and parent morale <br />Show concern, value and care for the entire school community <br />In order to accomplish as many of the desired outcomes as possible, the administration will develop <br />regulations that will be incorporated from the start of each new school design phase and followed <br />through to construction completion and building commissioning. Regulations will be derived directly <br />from or used in combination with the Triangle .I High Performance Guidelines. <br />School Board Policy 9~2O speaks to the instructional aspect of school design and the educational <br />specifications required and should be incorporated in any planning effort with the regulations contained <br />within., <br />Adopted: 3/ZI/02 <br />Regulations <br />Site <br />3.1 Erosion and Sediment control <br />• Design a system that controls and reduces the amount of'erosion and runoff from the site <br />http://nt~ scbbs..corn/cgi-bin/om_isapi.dll?clientID=546502&depth=2&infobase=chaphill,n.,. 8/11/2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.