Orange County NC Website
Revised 01/24 6 <br />unavailability or non-appropriation of public funds. It is expressly agreed that Owner shall <br />not activate this non-appropriation provision for its convenience or to circumvent the <br />requirements of this Agreement. <br />c. In the event of a change in the Owner’s statutory authority, mandate or mandated <br />functions, by state or federal legislative or regulatory action, which adversely affects <br />Owner’s authority to continue its obligations under this Agreement, then this Agreement <br />shall automatically terminate without penalty to Owner upon written notice to Contractor <br />of such limitation or change in Owner’s legal authority. <br />10. NOTICES <br />Any notice required by this Agreement shall be in writing and delivered by certified or registered <br />mail, return receipt requested to the following: <br />Owner: Contractor: <br />Orange County Clint Wilson Electric, Inc. <br />Attn: A. Barnes Attn: Clint Wilson <br />P.O. Box 8181 PO Box 971 <br />Hillsborough, NC 27278 Mebane, NC 27302 <br />11. MISCELLANEOUS <br />a. Duties and Obligations imposed by the Contract Documents shall be in addition to any <br />Duties and Obligations imposed by state, federal or local law, rules, regulations and <br />ordinances. <br />b. No act or failure to act by the Owner or Contractor shall constitute a waiver of any right or <br />duty granted them under the Contract Documents, nor shall any act or failure to act <br />constitute any approval except as specifically agreed in writing. <br />c. The Work shall be tested and inspected as required by the Contract Documents and as <br />required by law. Unless prohibited by law the costs of all such tests and inspections <br />related to state and federal codes such as ADA, Administrative, Electrical, Plumbing, <br />Mechanical and Building Codes shall be borne by the Contractor. The costs for material <br />and structural testing shall be conducted by an independent third party at the expense of the <br />Owner. Delays related to any of the aforementioned tests and inspections shall not be <br />grounds for delaying the completion of the work. If any such tests and inspections reveal <br />deficiencies in the Work such that the Work does not comply with terms or requirements <br />of the Contract Documents and the requirements of any code or law the Contractor is <br />solely responsible for the cost of bringing such deficiencies into compliance with the terms <br />of the Contract Documents and any code or law. <br />d. Should the Architect, if an architect is retained for the project involving the Work, or <br />Owner reject any portion of the Work for failing to comply with the Contract Documents <br />Contractor shall immediately, at Contractor’s expense, correct the Work. Any such <br />rejection may be made before or after substantial completion. If applicable, any additional <br />expense borne by the Architect under this section shall be paid at Contractor’s expense. <br />e. The Contractor shall not assign any portion of this Agreement nor subcontract the Work in <br />Docusign Envelope ID: ECB84049-C333-4032-A2B1-9D517DAB831E