Orange County NC Website
15 <br /> DRAFT <br /> 395 Patrick Mallett: Where do you stop? I mean, it would keep going and we need to have the process start <br /> 396 with the property owner and a surveyor. You have to have a surveyed boundary and a <br /> 397 surveyor attesting to the fact that that's the ridge line and it could keep going, we have <br /> 398 some adjacent property owners and I think one of them is going to contemplate whether <br /> 399 it's worth it for him to go through the same process. It's the property to the south of this <br /> 400 one. <br /> 401 Lamar Proctor: What's the practical result of moving it in terms of property use? <br /> 402 Patrick Mallett: It's simple but nuanced. Simple question with a nuanced answer. I think for larger <br /> 403 properties, not too much. In the second case you're going to see it had a direct impact on <br /> 404 that property owner and what she wanted to do. In this case, I think it has more to do with <br /> 405 the engineer pointing out if there's any development activity on this property or the smaller <br /> 406 lot, Lot No. 2 on this survey, there are implications that would apply in terms of impervious <br /> 407 to Lot No. 2. Ultimately the land disturbing activity on these properties would require a <br /> 408 land disturbance permit, a storm water analysis and so it has more to do with, from the <br /> 409 engineer's perspective, in that analysis I want to show pre and post-development, which <br /> 410 way the water's breaking and do my analysis accordingly versus running that analysis on <br /> 411 an arbitrary line that defies the laws of physics. <br /> 412 Lamar Proctor: Got it, thank you. <br /> 413 Patrick Mallett: Staff has determined the application is complete, staff reviewed the considerations of the <br /> 414 request, and it adheres to the principles of the Orange County 2030 comprehensive plan. <br /> 415 We went through the notifications like we would with other rezoning requests, signs, <br /> 416 notices, and put it on our website. And this is where we are. We went through planning <br /> 417 staff review, the DAC review, comments from other departments, and then this would get <br /> 418 referred on like other zoning cases to the board of county commissioners. We <br /> 419 recommend that you receive the rezoning application deliberate on the proposals desired, <br /> 420 consider the planning director's recommendation and make a recommendation to the <br /> 421 BOCC on either a statement of consistency or statement of inconsistency in the proposed <br /> 422 attachments. Our hope is to get this before the BOCC in time for September the 5th. The <br /> 423 next case, when I stop here you can ask questions about this case, then I can move on to <br /> 424 the next one. <br /> 425 Adam Beeman: We have two members of the public that want to speak on number 9. <br /> 426 Lamar Proctor: Is that the next one? <br /> 427 Adam Beeman: This one we're on right now. <br /> 428 Jerry Blanchard: I'll decline. All of my questions have already been answered. <br /> 429 Adam Beeman: Are you Jerry? <br /> 430 Jerry Blanchard: Yes sir. <br /> 431 Adam Beeman: The only other member was Frank. <br /> 432 Frank Cohen: I also yield my time, Patrick covered everything I had to say. <br /> 433 Adam Beeman: All right, perfect. Go ahead Charity. <br />