Orange County NC Website
35 <br /> 1 Slide #11 <br /> BOND STRATEGIES <br /> Issues with Consolidation <br /> CES site not suitable for consolidation , saoso <br /> Current CES capacity = 447* (Woolpert) <br /> * Addition i <br /> (new wing) would a capacity <br /> l �� lddd ''MEM't A <br /> o Largest current CCS school is 580* <br /> • Creek runs behind playground <br /> • Elevation change, steep slope Issues to Consider <br /> • Lack of space to expand parking <br /> • Traffic flow, e.g. car riders Numerous <br /> o HES 365 out of 438 enrolled consolidation <br /> • 1 use <br /> * CES 113 out of 291 enrolled <br /> pacity <br /> NOTE:Traditional calendar at Central Elementary, <br /> year-round calendar at Hillsborough Elementary <br /> ENGAGE. CHALLENGE. INSPIRE. <br /> Z <br /> 3 Dwayne Foster said the Woolpert Study recommended consolidation and the district had <br /> 4 some concerns and issues with that recommendation. He discussed the issues on slide #11. <br /> 5 <br /> 6 Slide #12 <br /> AJ- <br /> 4 <br /> 1� <br /> l <br /> 8 Dwayne Foster showed the location of the creek and the elevation changes. <br /> 9 <br />