Orange County NC Website
22 <br /> 1 Al Ciarochi said repairs and maintenance would be done there, but no long-term <br /> 2 improvements because the goal would be for those sites to be repurposed. <br /> 3 Commissioner Fowler asked if the HVAC systems will be fixed if they fail. <br /> 4 Al Ciarochi said absolutely yes and that they will continue to provide those maintenance <br /> 5 services that keep the schools safe and comfortable. <br /> 6 <br /> 7 Slide #18 <br /> How It Could Be Done.....* <br /> VIML L ifyell %Place <br /> Mcpaugle ES duaLlanguage Culbrelh M5, <br /> MS students Spanish prcgams Replace €tudents on-site <br /> ID new KS to McDougle campus CamhamES oral FPG <br /> M M I W9 BMW <br /> &Yid MOMf <br /> +1100k- eES FPG 511Adr05 aia•c AmmWing <br /> new M6 stadents to now at Mcpougk, return Estes Hills ES FM Estes Hills maintena nce <br /> cdHrESsclaols wCarrism ES sNdents wall-newt students rkokffWr orneplacemeM <br /> swing i with capacity swing ernplty-FG Can toborcES rwi;oschods needed at remaining schools <br /> FffiN0 IN <br /> f W NEXT REFERENDUM <br /> ION450INro • <br /> SM", <br /> *Orderofatinissulhyecttochtoge CH CS <br /> 9 Al Ciarochi said moving schools can be stressful and they have a plan to engage <br /> 10 community. <br /> 11 <br /> 12 Slide #19 <br /> Benefits of School Consolidation/Program Relocation <br /> Spanish <br /> Dual Language School Consolidation <br /> Relocation (ES) Operational Efficiencies <br /> I <br /> Relocation/expansion Reduce duplicative Eliminate utility Lower maintenance <br /> Of ES Spanish Dual roles costs in oldest costs due to reduced <br /> language program facilities portfolioage <br /> •AlIowsstu den tto receive greater .Nan-instructional •Electricity Reduction in facility <br /> exposure to target language support -Gas repairs with aging <br /> •Con sistency wit hIanguage Instruction al -Water equipment <br /> allocation,assessments, consolidation .Broadband <br /> curricula,etc. <br /> •Staffing optimization <br /> 13 19 CHCCS <br />