Orange County NC Website
45 <br /> DRAFT <br /> 50 zoning overlay, they're not requesting and we're not requesting to change the zoning <br /> 51 districts, it would still be rural residential R1, it would just change the boundary and the <br /> 52 distinction between what is in the Upper Eno Critical watershed and the Lower Eno. <br /> 53 Future land use designation, agricultural residential, rural residential on the 10-year <br /> 54 transition. Our request is to modify that boundary to the area in pink. It only applies, you <br /> 55 see an odd jog, the reason being is this property owner applied for that boundary <br /> 56 amendment and then went through the process with the state and that, prior to getting <br /> 57 here, included a petition by the property owner to us with a survey indicating, with a <br /> 58 registered surveyor's seal, recorded this is the ridge line I'm certifying that this is the ridge <br /> 59 line that's been recorded. We notified the state about that request. We also notified the <br /> 60 Board of County Commissioners, they received that request, it was then passed on to the <br /> 61 state and then passed on to the EMC. The state has acknowledged that boundary <br /> 62 change so as far as the state is concerned, that pink line is the ridge line. We're going <br /> 63 through the semantics of quite honestly just amending our overlay district to correspond <br /> 64 with that line. <br /> 65 Lamar Proctor: I had a quick question. <br /> 66 Patrick Mallett: Sure. <br /> 67 Lamar Proctor: Why just this property, why not the adjoining parcels and make it correct all the way <br /> 68 through? <br /> 69 Patrick Mallett: Where do you stop? I mean, it would keep going and we need to have the process start <br /> 70 with the property owner and a surveyor. You have to have a surveyed boundary and a <br /> 71 surveyor attesting to the fact that that's the ridge line and it could keep going, we have <br /> 72 some adjacent property owners and I think one of them is going to contemplate whether <br /> 73 it's worth it for him to go through the same process. It's the property to the south of this <br /> 74 one. <br /> 75 Lamar Proctor: What's the practical result of moving it in terms of property use? <br /> 76 Patrick Mallett: It's simple but nuanced. Simple question with a nuanced answer. I think for larger <br /> 77 properties, not too much. In the second case you're going to see it had a direct impact on <br /> 78 that property owner and what she wanted to do. In this case, I think it has more to do with <br /> 79 the engineer pointing out if there's any development activity on this property or the smaller <br /> 80 lot, Lot No. 2 on this survey, there are implications that would apply in terms of impervious <br /> 81 to Lot No. 2. Ultimately the land disturbing activity on these properties would require a <br /> 82 land disturbance permit, a storm water analysis and so it has more to do with, from the <br /> 83 engineer's perspective, in that analysis I want to show pre and post-development, which <br /> 84 way the water's breaking and do my analysis accordingly versus running that analysis on <br /> 85 an arbitrary line that defies the laws of physics. <br /> 86 Lamar Proctor: Got it, thank you. <br /> 87 Patrick Mallett: Staff has determined the application is complete, staff reviewed the considerations of the <br /> 88 request, and it adheres to the principles of the Orange County 2030 comprehensive plan. <br /> 89 We went through the notifications like we would with other rezoning requests, signs, <br /> 90 notices, and put it on our website. And this is where we are. We went through planning <br /> 91 staff review, the DAC review, comments from other departments, and then this would get <br /> 92 referred on like other zoning cases to the board of county commissioners. We <br /> 93 recommend that you receive the rezoning application deliberate on the proposals desired, <br /> 94 consider the planning director's recommendation and make a recommendation to the <br />