State of North Carolina Department of Environmental Quality 36 <br /> INTERGOVERNMENTAL REVIEW PROJECT COMMENTS <br /> Reviewing Regional Office: Raleigh <br /> Project Number: 24-0326 Due Date:7 22 2024 <br /> County: Orange <br /> Normal Process <br /> PERMITS SPECIAL APPLICATION PROCEDURES or REQUIREMENTS Time <br /> (Statutory time <br /> limit) <br /> On-site inspection usual.Surety bond filed with DEQ Bond amount <br /> ❑ <br /> varies with type mine and number of acres of affected land.Affected 30 days Mining Permit area greater than one acre must be permitted.The appropriate bond (60 days) <br /> must be received before the permit can be issued. <br /> If permit required,application 60 days before begin construction. <br /> Applicant must hire N.C.qualified engineer to prepare plans,inspect <br /> construction,and certify construction is according to DEQ approved <br /> ❑ Dam Safety Permit <br /> plans.May also require a permit under mosquito control program.And 30 days <br /> a 404 permit from Corps of Engineers.An inspection of site is necessary (60 days) <br /> to verify Hazard Classification. A minimum fee of$200.00 must <br /> accompany the application.An additional processing fee based on a <br /> percentage,or the total project cost will be required upon completion. <br /> ❑ Oil Refining Facilities N/A 90-120 days <br /> (N/A) <br /> File surety bond of$5,000 with DEQ running to State of NC conditional 10 days <br /> ❑ Permit to drill exploratory oil or gas well that any well opened by drill operator shall,upon abandonment,be N/A <br /> plugged according to DEQ rules and regulations. <br /> ❑ Geophysical Exploration Permit <br /> Application filed with DEQ at least 10 days prior to issue of permit. 10 days <br /> Application by letter.No standard application forms. N/A <br /> Application fee based on structure size is charged.Must include <br /> 15-20 days <br /> ❑ State Lakes Construction Permit descriptions&drawings of structure&proof of ownership of riparian N/A <br /> property <br /> Compliance with the T15A 02H.0500 Certifications are required 60 days <br /> ❑ 401 Water Quality Certification whenever construction or operation of facilities will result in a (130 days) <br /> discharge into navigable water as described in 33 CFR part 323. <br /> Compliance with Catawba,Goose Creek,Jordan Lake,Randleman,Tar Pamlico or Neuse Riparian Buffer Rules is required.Buffer requirements: <br /> ❑ http://deg.nc.gov/about/divisions/water-resources/water-resources-permits/wastewater-branch/401-wetlands-buffer-permits/401-riparian- <br /> buffer-protection-program <br /> Nutrient Offset:Loading requirements for nitrogen and phosphorus in the Neuse and Tar-Pamlico River basins,and in the Jordan and Falls Lake <br /> ❑ watersheds,as part of the nutrient-management strategies in these areas. DWR nutrient offset information: <br /> http://deg.nc.gov/about/divisions/water-resources/planning/nonpoint-source-management/nutrient-offset-information <br /> ❑ CAMA Permit for MAJOR development $250.00-$475.00 fee must accompany application 75 days <br /> (150 days) <br /> ❑ CAMA Permit for MINOR development $100.00 fee must accompany application 22 days <br /> (25 days) <br /> ❑ Abandonment of any wells,if required must be in accordance with Title 15A.Subchapter 2C.0100. <br /> ❑ Notification of the proper regional office is requested if"orphan"underground storage tanks(USTS)are discovered during any excavation <br /> operation. <br /> Plans and specifications for the construction,expansion,or alteration of a public water system must be approved by the <br /> Division of Water Resources/Public Water Supply Section prior to the award of a contract or the initiation of construction <br /> ® as per 15A NCAC 18C.0300 et.seq.,Plans and specifications should be submitted to 1634 Mail Service Center,Raleigh, 30 days <br /> North Carolina 27699-1634. All public water supply systems must comply with state and federal drinking water monitoring <br /> requirements.For more information,contact the Public Water Supply Section,(919)707-9100. <br /> If existing water lines will be relocated during the construction,plans for the water line relocation must be submitted to <br /> ® the Division of Water Resources/Public Water Supply Section at 1634 Mail Service Center,Raleigh,North Carolina 27699- 30 days <br /> 1634.For more information,contact the Public Water Supply Section,(919)707-9100. <br /> Plans and specifications for the construction,expansion,or alteration of the water system must be approved through the delegated <br /> ❑ plan approval authority. Please contact them at for further information. <br /> DEQ INTERGOVERNMENTAL REVIEW PROJECT Form Page 2 of 3 <br /> April 4,2022/lbh <br />