Browse
Search
Agenda - 09-05-2024; 8-l - Major Subdivision Preliminary Plat Application – Stonewall
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 09-05-2024 Business Meeting
>
Agenda - 09-05-2024; 8-l - Major Subdivision Preliminary Plat Application – Stonewall
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2024 11:34:18 AM
Creation date
8/29/2024 11:17:42 AM
Metadata
Fields
Template:
BOCC
Date
9/5/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-l
Document Relationships
Agenda for September 5, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 09-05-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
50 <br /> 6. The stream buffer areas denoted on the approved Preliminary Plat shall <br /> be left in an undisturbed, natural state. <br /> F. Drainage <br /> 1. The applicant shall submit a final Stormwater Management and Erosion <br /> Control Plan for approval by Orange County Erosion Control prior to the <br /> commencement of land disturbing activities. <br /> 2. Drainage easements shall be located on the Final Plat as required <br /> following review and approval of the stormwater management plan by <br /> Erosion Control staff. <br /> 3. Drainage culverts shall be sized and located appropriately, as required by <br /> NCDOT and Erosion Control, by a licensed North Carolina Professional <br /> Engineer. <br /> G. Emergency Services <br /> 1. The developer shall continue work between property owners, NCDOT and <br /> the Orange County Fire Marshal to ensure that adequate <br /> access/maintenance of fire water source(s) and suppression devices (e.g. <br /> fire hydrants) has been obtained. <br /> H. Parkland <br /> 1. At the time of recordation of the Final Plat, the applicant shall pay to <br /> Orange County $7,596.00 ($422.00 times 18 lots) payment-in-lieu-of- <br /> parkland dedication fee. <br /> I. Construction Waste <br /> 1. Per Orange County Ordinance, clean wood waste, scrap metal and <br /> corrugated cardboard and all present construction waste, must be <br /> recycled. <br /> 2. Per Orange County Ordinance, all haulers of construction waste must be <br /> properly licensed. <br /> 3. Prior to any demolition or construction activity on the site the applicant <br /> shall hold a pre-demolition/pre-construction conference with the County's <br /> Solid Waste staff. This may be the same meeting held with other <br /> development officials. <br /> J. Miscellaneous <br /> 1. The Final Plat shall contain a title block and vicinity map in accordance <br /> with the UDO. <br /> 2. The open space shall be conveyed into the Homeowner's Association <br />
The URL can be used to link to this page
Your browser does not support the video tag.