Browse
Search
Agenda - 09-05-2024; 8-l - Major Subdivision Preliminary Plat Application – Stonewall
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 09-05-2024 Business Meeting
>
Agenda - 09-05-2024; 8-l - Major Subdivision Preliminary Plat Application – Stonewall
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2024 11:34:18 AM
Creation date
8/29/2024 11:17:42 AM
Metadata
Fields
Template:
BOCC
Date
9/5/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-l
Document Relationships
Agenda for September 5, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 09-05-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
38 <br /> Stormwater Management: <br /> The submitted materials indicate a level of development that could meet current UDO <br /> requirements specific to stormwater management. Two (2) permanent Stormwater <br /> Control Measures (SCMs) are proposed; specifically, "SWM 1" and "SWM 2". Only the <br /> general locations of the proposed SCMs have been provided, with no supporting <br /> calculations. The project will need to meet applicable stormwater management <br /> requirements as outlined in Section 6.14 of the Orange County UDO and must be in <br /> general conformance with the North Carolina Stormwater Design Manual (i.e., Minimum <br /> Design Criteria). <br /> Conclusion: <br /> The Division has No Objections to the approval of the SUB application so long as a <br /> complete LDP application and supporting plans and calculations are submitted for review, <br /> processing, and approval prior to commencement of on-site Land-Disturbing Activity. As <br /> the project progresses, additional field observations, additional permitting by others (e.g., <br /> US Army Corps of Engineers, NC Department of Environmental Quality, NC Department <br /> of Transportation, etc.), additional buffers, setbacks, and/or additional Orange County <br /> review and permitting may apply beyond the proposed development as shown with this <br /> SUB application. <br /> D Digitally signed by Christopher J.Sandt,P.E. <br /> Christopher J. Sandt, 1 ,E� DNcngineertog herJon,a PE.,o=Orange Cgecountyn.ov,Carolina, <br /> ou=En ineerin Division email=csand[@oran ecount nc.ov,-US <br /> Date:2024.02.28 15:33:00-05'00' <br /> Christopher Sandt, PE Date <br /> 2/28/24 <br /> Steve Kaltenbach Date <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.