Orange County NC Website
37 <br /> 1 Slide #15 <br /> BOND STRATEGIES <br /> Orange Middle School <br /> Funding <br /> * Renovation: focus on Educational Adequacy <br /> Waolpert <br /> o Distributes funding districtwide,still with Option C: 48.5 M <br /> significant improvements at 0MS Orange <br /> e CTE/EC Upgrades Schools:County 1�•8 <br /> * ADA compliant hardware <br /> * HVAC upgrades to auditorium Issues to Consider <br /> * New kitchen freezers/coolers, backup generator <br /> * Enclose courtyard, decorative fencing <br /> * Replace HVAC boilersyears <br /> * Replace courtyard canopy <br /> v Gym renovation • <br /> * Differing estimates&scope <br /> •"r ENGAGE. CHALLENGE. INSPIRE. <br /> Z <br /> 3 <br /> 4 Slide #16 <br /> BOND STRATEGIES <br /> Partnership Academy HS <br /> Funding <br /> * High Priority Needs & Educational Adequacy <br /> waolpert �•� � <br /> * New site location: moved from Storey Lane to option C: <br /> Corporate Drive (Welcome Center Building 2) orange County <br /> * Kitchen/Cafeteria addition (school, CTE) schools: 1S•5 <br /> * Reroof 1C Building 1 <br /> * Life cycle mechanical <br /> ISSUF" to�'nrrn���r <br /> * New fire alarm <br /> * Additional parking <br /> - of Partnership Academy <br /> Welcome • <br /> * Repair/replace fencing changed significantly since <br /> Increased overall square footage by—sq. ft. e i F'rt i <br /> 9 Future of Building I still <br /> Added classroom, (gym) multipurpose and outdoor considered M. <br /> space, hallways, and spaces for student support <br /> "Fully-functional school" <br /> � ENGAGE. CHALLENGE. INSPIRE- <br /> 5 <br /> 6 Commissioner McKee asked how much square footage it creates. <br /> 7 Dwayne Foster said 100,000 square feet. <br /> 8 Commissioner Hamilton asked how many students are served and will be served by this <br /> 9 change. <br />