Browse
Search
Agenda - 09-05-2024; 8-a - Minutes
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 09-05-2024 Business Meeting
>
Agenda - 09-05-2024; 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2024 11:38:01 AM
Creation date
8/29/2024 11:15:17 AM
Metadata
Fields
Template:
BOCC
Date
9/5/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-a
Document Relationships
Agenda for September 5, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 09-05-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
37 <br /> 1 Slide #15 <br /> BOND STRATEGIES <br /> Orange Middle School <br /> Funding <br /> * Renovation: focus on Educational Adequacy <br /> Waolpert <br /> o Distributes funding districtwide,still with Option C: 48.5 M <br /> significant improvements at 0MS Orange <br /> e CTE/EC Upgrades Schools:County 1�•8 <br /> * ADA compliant hardware <br /> * HVAC upgrades to auditorium Issues to Consider <br /> * New kitchen freezers/coolers, backup generator <br /> * Enclose courtyard, decorative fencing <br /> * Replace HVAC boilersyears <br /> * Replace courtyard canopy <br /> v Gym renovation • <br /> * Differing estimates&scope <br /> •"r ENGAGE. CHALLENGE. INSPIRE. <br /> Z <br /> 3 <br /> 4 Slide #16 <br /> BOND STRATEGIES <br /> Partnership Academy HS <br /> Funding <br /> * High Priority Needs & Educational Adequacy <br /> waolpert �•� � <br /> * New site location: moved from Storey Lane to option C: <br /> Corporate Drive (Welcome Center Building 2) orange County <br /> * Kitchen/Cafeteria addition (school, CTE) schools: 1S•5 <br /> * Reroof 1C Building 1 <br /> * Life cycle mechanical <br /> ISSUF" to�'nrrn���r <br /> * New fire alarm <br /> * Additional parking <br /> - of Partnership Academy <br /> Welcome • <br /> * Repair/replace fencing changed significantly since <br /> Increased overall square footage by—sq. ft. e i F'rt i <br /> 9 Future of Building I still <br /> Added classroom, (gym) multipurpose and outdoor considered M. <br /> space, hallways, and spaces for student support <br /> "Fully-functional school" <br /> � ENGAGE. CHALLENGE. INSPIRE- <br /> 5 <br /> 6 Commissioner McKee asked how much square footage it creates. <br /> 7 Dwayne Foster said 100,000 square feet. <br /> 8 Commissioner Hamilton asked how many students are served and will be served by this <br /> 9 change. <br />
The URL can be used to link to this page
Your browser does not support the video tag.