Orange County NC Website
36 <br /> 1 Slide #13 <br /> N. .. - <br /> .+nIM� 1p <br /> do <br /> q� 0 <br /> 2 <br /> 3 Dwayne Foster showed where traffic issues would occur on slide #13. <br /> 4 <br /> 5 Slide #14 <br /> CAPITAL PROJECTS <br /> Central Elementary <br /> Scope of ongoing work: <br /> • Current HVAC renovation <br /> • Recent roof replacement <br /> • Electrical upgrades (switchgear) <br /> • Lighting upgrades (LED conversion) <br /> • Partial ceiling replacement Issues to Consider <br /> • Boilers replaced * Best possibleversions <br /> • Controls upgrades (HVAC,) Our ., <br /> Is <br /> bond investment <br /> addresses <br /> AdequacyNeeds & Education <br /> ENGAGE. CHALLENGE. INSPIRE- <br /> 6 <br /> 7 Dwayne Foster said they identified $5 million from the bond to assist in the creation of <br /> 8 creating the best possible schools. <br /> 9 <br /> 10 <br />