Browse
Search
Agenda - 09-05-2024; 8-a - Minutes
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 09-05-2024 Business Meeting
>
Agenda - 09-05-2024; 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2024 11:38:01 AM
Creation date
8/29/2024 11:15:17 AM
Metadata
Fields
Template:
BOCC
Date
9/5/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-a
Document Relationships
Agenda for September 5, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 09-05-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31 <br /> 1 Slide #3 <br /> Focus: Improve Educational Adequacy <br /> � Safe <br /> • How facilities design should AcpuskiCal Vehicular& Integrated Healthy <br /> support and enhance educational special Learning <br /> Control pedestrian programming Approach Education Environments <br /> How teaching & learning should Efficient <br /> function in each space Logical Space Mechanical <br /> How individual spaces should Adjacencies Critical Spatial& Systems <br /> work together to serve the school <br /> Educational <br /> district's vision adequate + + parking <br /> Specialty >ueeds <br /> What tools each space should Spaces <br /> have to serve its core functions, <br /> and whether those need to be SatisfyAll ADA <br /> fixed or flexible Safety& Visual Program compliance/ <br /> Security Control Space Needs Accessibility <br /> J Throughout <br /> ENGAGE. CHALLENGE. INSPIRE. <br /> Z <br /> 3 <br /> 4 Slide #4 <br /> Focus: Improve Educational Adequacy <br /> Aligned with Woolpert Study, Option C <br /> • Comfortable and Safe, New School, some Updated Learning Tools <br /> • Conservative, Balanced 10-Year Plan <br /> Option C Projects, Not Selected Board of Education <br /> ACES& H ES-Consolidation Priority Projects, <br /> •OMS-Roof Replacement,HVAC,Gymnasium Renovations Previously Identified <br /> Option D Projects, Expedited Programming <br /> .. .D. Compliance <br /> +RPES-Replacing Select HVAC,Flooring In AdvanceIn-terior Walls <br /> r ENGAGE. CHALLENGE. INSPIRE- <br /> 5 <br /> 6 <br /> 7 <br /> 8 <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.