Browse
Search
Agenda - 09-05-2024; 8-a - Minutes
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 09-05-2024 Business Meeting
>
Agenda - 09-05-2024; 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2024 11:38:01 AM
Creation date
8/29/2024 11:15:17 AM
Metadata
Fields
Template:
BOCC
Date
9/5/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-a
Document Relationships
Agenda for September 5, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 09-05-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 <br /> 1 Slide #8 <br /> The Core of the Plan <br /> i11 FCI assessment <br /> From short-term (reactive) <br /> Capacity , 1 to long-term (proactive) <br /> Tenets the Plan *' Operatio nalfinstructio nal <br /> Facilityage -o# <br /> I I r inefficiencies <br /> Educational adequacy <br /> _ Limitation of available land <br /> for replacements <br /> What investments are best for students <br /> 2 and best in the long terms [`H CC; <br /> 3 Al Ciarochi said age is not considered in the FCI. He said that Carrboro and Chapel Hill <br /> 4 had high FCI numbers, but they would not consider replacing a newer school. He said they have <br /> 5 reached an age where costs of maintenance have increased. He said they do not rely solely on <br /> 6 FCI but if it is high, it must be looked into. He said they want to make sure they identified <br /> 7 operational and instructional inefficiencies. He said they want to develop a plan that is best for all <br /> 8 stakeholders involved — both short and long-term. He said the limit on available land is a <br /> 9 challenge. He said that they cannot build on land that already has a school. He said that swing <br /> 10 space creation has to be part of the plan. He said to minimize the disruption, it has to be <br /> 11 consolidated, a school brought offline, and then rotated through the schools. He said the needs <br /> 12 are greater than the means. He said there are projects that are not included but they still should <br /> 13 be. He said that they appreciate the support of Orange County. <br /> 14 <br /> 15 Slide #9 <br /> CHCCS/Woolpert Findings <br /> 16 CHCCS <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.