Browse
Search
Agenda - 09-05-2024; 5-b - Zoning Atlas Amendment – Dimmocks Mill Road, Hillsborough, Hillsborough Township YES
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 09-05-2024 Business Meeting
>
Agenda - 09-05-2024; 5-b - Zoning Atlas Amendment – Dimmocks Mill Road, Hillsborough, Hillsborough Township YES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2024 11:39:54 AM
Creation date
8/29/2024 11:12:33 AM
Metadata
Fields
Template:
BOCC
Date
9/5/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-b
Document Relationships
Agenda for September 5, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 09-05-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31 <br /> requirements as required by Orange County UDO Section 6.15 and could be developed <br /> as generally proposed. <br /> Stormwater Management: <br /> There were no stormwater management related materials included in the Rezoning <br /> Application. The submitted materials indicate a level of development that could meet <br /> current UDO requirements specific to stormwater management. The project will need to <br /> meet applicable stormwater management requirements as outlined in Section 6.14 of the <br /> Orange County UDO and must be in general conformance with the North Carolina <br /> Stormwater Design Manual (i.e., Minimum Design Criteria). <br /> Conclusion: <br /> The Division has No Objections to the approval of the Rezoning Application so long as a <br /> complete LDP application and supporting plans and calculations are submitted for review, <br /> processing, and approval prior to commencement of any on-site Land-Disturbing Activity. <br /> As the project progresses, additional field observations, additional permitting by others, <br /> and/or additional Orange County review and permitting may apply beyond the proposed <br /> development as shown with the Rezoning Application. <br /> C Digitally signed by Christopher J.San dt,P.E. <br /> Christopher J. S a n d t P.E DN cngineertng Diviopher sion, <br /> on,ema E,saOrange County,tync.orth Carolina <br /> , <br /> � . ou=Engineering Division,email=csandt@orangecountyncgov,c=US <br /> Date:2024.07.17 16:19:55-04'00' <br /> Christopher Sandt, PE Date <br /> 7/18/2024 <br /> Steve Kaltenbach Date <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.