Browse
Search
08.19.2024 OUTboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
08.19.2024 OUTboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2024 4:07:04 PM
Creation date
8/16/2024 3:56:59 PM
Metadata
Fields
Template:
BOCC
Date
8/19/2024
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• r . . <br /> Project ID • . Description Specific <br /> Modernize Orange Grove Road from 1-85 to Dodson Crossroad <br /> with NCDOT standard street cross-section 2B(60'row, 11' <br /> 144 42 Hwy-051 Modenization Orange Grove Road travel lanes,with 5'paved shoulder),add turn lanes and safety 15% 62/° 76/° ° <br /> improvements at Ode Turner Road, Dimmocks Mill Road, <br /> Crossroad Church Cemetery Road, Davis Drive, Kimbro Road, <br /> and Dodson Crossroads. <br /> 145 85 BP-416 Bike Ped Mt.Carmel Church Road Paved Greenway 10% 32% 41% <br /> 146 86 BP-375 Bike Ped NC 86 On road bicycle improvement and pedestrian path 1% 40% 41% <br /> 147 87 BP-364 Bike Ped LEBANON RD/E BROWN Paved shoulder recommended and sidewalk 7% 34% 41% <br /> ST <br /> 148 88 BP-438 Bike Ped Proposed shared use path Follows sewer easement to connect to end of Creeks Edge Ct 4% 37% 41% <br /> / <br /> 149 43 Hwy-034 New Location 1-40 Widen to six lanes,improve NC 86 interchange,and install ITS. 24% 52% 75% <br /> Widening <br /> Modernize NC 10 from NC 86 to US 70 Business with NCDOT <br /> 150 44 Hwy-055 Modenization Old NC 10 cross section 26,add turn lanes and safety improvements at 7% 67/° 74/°° ° <br /> Larence Road, New Hope Church Road, University Station <br /> Road, Mt Harmon Church Road,and US 70 Business <br /> 151 89 BP-439 Bike Ped Proposed shared use path Sewer easement from McPherson south to Avalon and east to 1% 40% 41% <br /> Oakwood <br /> 152 90 BP-413 Bike Ped Rogers Road Paved Greenway 16% 24% 40% <br /> 153 91 BP-338 Bike Ped W Ten Rd On road 4' Paved Shoulder 4% 37% 40% <br /> 154 92 BP-475 Bike Ped Old Field Creek Trail Off road unpaved trail 9% 31% 40% <br /> Modernize Dairyland Road from Orange Grove Road to Old NC <br /> 86 with NCDOT standard street cross-section 2B,add turn <br /> 155 45 Hwy-052 Modenization Dairyland Road lanes and safety improvements at Orange Grove Road, Dodson 9% 63% 72% <br /> Crossroads, Rocky Ridge Road, Bethel Hickory Grove Church <br /> Road and convert intersection at Old NC 86 to a roundabout <br /> Modernize Dodson Crossroad (SR-1102)from Orange Grove <br /> Road (SR-1006)to NC-54 with NCDOT standard street cross <br /> 156 46 Hwy-053 Modenization Dodson Crossroads 11% 61% 72% <br /> section 2B(60' row, 11'travel lanes,with 5'paved shoulder), <br /> add turn lanes and safety improvements at each intersection. <br /> 157 93 BP-362 Bike Ped University Station Rd On road From Orange County Bicycle Routes Map 3% 37% 40% <br /> 158 94 BP-372 Bike Ped NC 49 On Road, Needs Improvement 0% 39% 39% <br /> 159 95 BP-460 Bike Ped Sunrise Road (west side) Sidewalk 13% 26% 39% <br /> 160 96 BP-409 Bike Ped Sunrise Road Paved Greenway 13% 26% 39% <br /> 161 47 Hwy-020 Modenization Buckhorn Road Upgrade the current unsurfaced 20-foot cross section to a 7% 64/° 71/°° ° <br /> surfaced,24-foot cross section suitable for public traffic use. <br /> Construct one additional lane between Patriot's Pointe Drive <br /> New Location <br /> and New Grady Brown School Road(SR 1221)with bike/ped <br /> / <br /> 162 48 Hwy-054 Widening Orange Grove Road improvements.The 1-40 bridge would be widened to 7% 63% 71% <br /> accommodate both pedestrian and bicycle amenities and one <br /> additional travel lane. <br /> 163 97 BP-324 Bike Ped Miller Rd/Baldwin Rd On road 4' Paved Shoulder 6% 33% 39% <br /> 164 98 BP-304 Bike Ped Mt Carmel Church Rd On road Bicycle Lane 8% 31% 38% <br /> Lynch Store Rd/Doc <br /> 165 99 BP-393 Bike Ped Corbett Rd/McDade Unspecified On-road Bike Improvement 0% 38% 38% <br /> Store Rd/Pentecost Rd <br /> 166 100 BP-478 Bike Ped Ben Wilson Rd Sidewalk 5% 34% 38% <br /> New Location <br /> Provide a new location 2-lane cross section at Walnut Grove <br /> / ° ° <br /> 167 49 Hwy-022 Widening Little River Church Rd Ext Church Road to extend Little River Church Road into Sawmill 20% 51% 71% <br /> Road to provide better east-west continuity and connectivity. <br /> 168 50 Hwy-039 Modenization Lebanon Road Intersection and safety improvements along Lebanon Road 9% 62% 70% <br /> 169 101 BP-433 Bike Ped Proposed trail Multiuse Path 7% 31% 38% <br /> 170 102 BP-458 Bike Ped Mebane Oaks Road Multi-Use Path or Sidepath 0% 38% 38% <br /> 171 103 BP-383 Bike Ped Oak Grove Church Rd/ Unspecified On-road Bike Improvement 0% 38% 38% <br /> Vernon Rd <br /> Mt Hernon Church Rd/W <br /> 172 104 BP-328 Bike Ped Cornwallis Rd/Schley Rd On road 4' Paved Shoulder 1% 37% 38% <br /> /Pleasant Green Rd <br /> Widen to a 4-lane divided cross-section with curb and gutter, <br /> 5'bikes lanes,sidewalks,and transit accomodations(110'row, <br /> 17.5' median, 11'travel lanes). Improve intersections from <br /> Buckhorn Road to Durham County.Add turn lanes and safety <br /> 173 51 Hwy-006 New Location/Widening US 70 improvements at NC 86,St Mary's Road, Efland Cedar Grove 13% 56% 69% <br /> Road, Frazier Road, Richmond Road, Brookhollow Road, <br /> Faucette Mill Road, Miller Road, Lawrence Road, Palmers <br /> Grove Church Road, Pleasant Green Road,Orange High School <br /> Road,and N Scotswood Boulevard. <br /> 174 52 Hwy-011 Modenization Homestead Rd Add turn lanes where needed. Bike lanes and sidewalks are 20% 48/° 68/°° ° <br /> recommended along the entirety of the corridor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.