Browse
Search
08.19.2024 OUTboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
08.19.2024 OUTboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2024 4:07:04 PM
Creation date
8/16/2024 3:56:59 PM
Metadata
Fields
Template:
BOCC
Date
8/19/2024
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mode <br /> Project ID 'Descriptio" Specific <br /> A Score <br /> 1 1 BPI-702 Bike Ped Bridge 1-40/Orange Grove Rd Grade separate bike/ped path from 1-40 70% 86% 156% <br /> 2 2 BP-349 Bike Ped S Churton St On road 4' Paved Shoulder(or bicycle lane) 75% 52% 126% <br /> 3 3 BP-418 Bike Ped Martin Luther King Jr. Paved Greenway 18% ° <br /> Blvd 87/0 106/0 <br /> 4 4 BP-424 Bike Ped Duke Easement Trail 3 Multiuse Path 56% 45% 101% <br /> 5 1 TR-806 Transit NC 54 West Express Bus 83% 73% 156% <br /> 6 2 TR-813 Transit Old NC 86 Bus along INC 86 63% 64% 126% <br /> 7 3 TR-802 Transit NCRR Commuter Rail Transit 39% 58% 98% <br /> Upgrade interchange capacity; managed lane access; increase <br /> 8 1 Int 201 Intersection I-40/NC 86 Interchange 77% 75% 152% <br /> cycle length of 1-40 westbound ramps at NC 86 <br /> 9 2 Int-207 Intersection Buckhorn Road/Industrial Intersection Improvements 91% 55% 145% <br /> Drive <br /> 10 5 BPI-700 Bike Ped Bridge <br /> I-85/Cates Creek Bridge to separate 1-85 and Cates Creek Greenway. From 56/°° 40% 96% <br /> Greenway H'boro Planning <br /> 11 6 BP-350 Bike Ped S Churton St On road 4' Paved Shoulder(or bicycle lane)and sidewalk 47% 42% 90% <br /> 12 7 BP-447 Bike Ped NC 54 ANDERSON PARK TO JAMES STREET IN CARRBORO. 28% 59% 87% <br /> CONSTRUCT MULTI-USE PATH ON NORTH SIDE OF NC 54. <br /> 13 8 BPI-703 Bike Ped Bridge 1-40/New Hillborough Bicycle/pedestrian bridge over 1-85 47% 39% 87% <br /> collector road <br /> 14 4 TR-810 Transit 1-40 Bus along 1-40 52% 44% 95% <br /> 15 5 TR-814 Transit <br /> Davis Rd/Orange Grove °Rd New OCTS fixed route,improve Hillsborough Circulator 38 52% 90% <br /> /° <br /> 16 6 TR-816 Transit NC-86 Bus along NC 86 36% 52% 88% <br /> 17 3 Int-212 Intersection NC 86 Replace Bridge 670049 over North Carolina Railroad/Norfolk 59/° 85% 144% <br /> Southern Railroad ° <br /> 18 4 Hwy-031 Modenization NC 86 Upgrade to a reduced conflict intersection. 71% 65% 136% <br /> 19 9 BP-301 Bike Ped Homestead Rd On road Bicycle Lane 23% 59% 82% <br /> 20 10 BP-487 Bike Ped Orange Grove Rd Sidewalk 26% 54% 80% <br /> 21 11 BP-480 Bike Ped Oakdale Dr Sidewalk 29% 49% 79% <br /> 22 12 BP-453 Bike Ped Hillsborough North South Proposed trail 56% 22% 78% <br /> Connector <br /> 23 7 TR-815 Transit Richmond/Lebanon/ Deviated fixed route 29% 56% 85% <br /> Doe Run/Mill Creek <br /> 24 8 TR-807 Transit 1-40/1-85 OCTS BRT 49% 34% 83% <br /> 25 9 TR-804 Transit NC 86 Add high capacity transit;Chapel Hill to Hillsborough 51% 31% 82% <br /> SR 1008(Mt Carmel <br /> SR 1913(Bennett Road)in Chapel Hill.Construct roundabout <br /> 26 5 Int-216 Intersection Church Road SR 1913 48% °83/° °131/° <br /> / and related safety improvements <br /> (Bennett Road) <br /> 27 6 Hwy-030 Modenization NC 54 Construct operational improvements,including 51/° 79% 129% <br /> bicycle/pedestrian accomodations <br /> MORGAN CREEK WESTERN SECTION,SR 1919(SMITH LEVEL ROAD)TO <br /> 28 13 BP-448 Bike Ped GREENWAY UNIVERSITY LAKE IN CARRBORO. CONSTRUCT GREENWAY 22% 55% 77% <br /> AND CONNECTIONS. <br /> 29 14 BP-322 Bike Ped US 70 On road 4' Paved Shoulder and sidewalk 33% 40% 74% <br /> 30 15 BP-419 Bike Ped 35 68 <br /> (UNC)na North Trails Paved Greenway 32% ° °/°/° <br /> 31 16 BP-358 Bike Ped US 70 A On road Bicycle Lane and sidewalk 45% 22% 67% <br /> 32 10 TR-800 Transit NC 86 Recommended transit 27% 55% 82% <br /> 33 11 TR-818 Transit Saint Marys New deviated fixed route 37% 39% 76% <br /> 34 12 TR-801 Transit NC 54 West Recommended transit 28% 46% 74% <br /> 35 7 Int-215 Intersection NC 54/SR 1006 SR 1006(Orange Grove Road). Intersection improvements 60% 67% 127% <br /> 36 8 Int-214 Intersection 1-85/NC 86 NC 86 in Hillsborough. Upgrade interchange 32% 93% 125% <br /> 37 17 BP-450 Bike Ped Proposed Trail Proposed trail 40% 26% 67% <br /> 38 18 BP-456 Bike Ped Ridgewalk Greenway Greenway 40% 26% 66% <br /> 39 19 BP-491 Bike Ped Mayo St Sidewalk 35% 30% 65% <br /> 40 20 BP-488 Bike Ped Millstone Dr Sidewalk 30% 34% 64% <br /> 41 13 TR-819 Transit New Sharon Church Bus along New Sharon Church Rd 28% 38% 66% <br /> Increase transit access with more stops, improve Hillsborough <br /> 42 14 TR-808 Transit US-70 37% 28% 65% <br /> Circulator <br /> Hatch Road/Old <br /> 43 15 TR-811 Transit Greensboro Rd/White New OCTS fixed route 29% 35% 64% <br /> Cross Rd/Butner Rd <br /> 44 9 Int-213 Intersection 1-85/SR 1009 SR 1009(South Churton Street)in Hillsborough. Interchange 32% 93% 125% <br /> improvements <br /> Improve to a 2-lane with two way left turn lane,curb and <br /> 45 10 Hwy-008 Modenization Mt.Carmel Church Rd 49% 70% 119% <br /> gutter, bikes lanes,sidewalks,and transit accomodations <br /> 46 21 BP-486 Bike Ped Orange High School Rd Sidewalk 34% 29% 64% <br /> 47 22 BP-484 Bike Ped Rencher St Sidewalk 27% 36% 63% <br /> 48 23 BP-414 Bike Ped Homestead Rd Paved Greenway 29% 34% 63% <br /> 49 24 BP-348 Bike Ped Orange Grove On road 4' Paved Shoulder and sidewalk 19% 43% 62% <br /> Fixed Guideway proposed on the existing Amtrak freight rail <br /> 50 16 TR-821 Transit Amtrak Track 40% 21% 61% <br /> track <br /> High Rock Rd/Efland ° ° <br /> 51 17 TR-822 Transit Proposed urban fixed bus corridor 29/° 29/° 58/° <br /> Cedar Grove Rd <br /> 52 18 TR-809 Transit Mt Moriah/Whitfield/ New OCTS fixed route 36% 5% 41% <br /> Erwin <br /> Improve truck safety with wayfinding, incident management, <br /> 53 11 Hwy-049 Modenization 1-40 dynamic message signs on road conditions,and/or accel/decel 54% 63% 117% <br /> lanes <br /> New Location/ SR 1009(SOUTH Widen to multi-lanes with bicycle, pedestrian,and transit <br /> 54 12 Hwy-028 29% 86% 115% <br /> Widening CHURTON STREET) accomodations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.