Browse
Search
08.19.2024 OUTboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
08.19.2024 OUTboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2024 4:07:04 PM
Creation date
8/16/2024 3:56:59 PM
Metadata
Fields
Template:
BOCC
Date
8/19/2024
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br /> TIP/WBS# Description LET/Start Completion Cost Status Project Lead <br /> Date Date <br /> SS-6207T Portions of Twenty-One(21)Routes.Curve Warning Sign 9/20/2023 9/30/24 $200,000 Planning and design activities underway. Dawn McPherson <br /> 51112 Installation. Construction started. <br /> SS-6207A NC 54 Pedestrian improvements between SR 1902 2/15/2024 10/31/2024 $171,000 Planning and design activities underway. Dawn McPherson <br /> 50337 (Manning Drive)and SR 1937(Old Fayetteville Road)in Materials have arrived and work has <br /> Chapel Hill and Carrboro. Improvements will include refuge begun. <br /> islands,crosswalks and pedestrian signals. Improvements <br /> to be completed by state forces. <br /> 51130 Eliminate slip ramp on SR 1120(Mt.Willing Road)at SR 5/20/2024 Summer 2024 $75,000 Funding approved by BOT.Traffic Matthey Whitley <br /> 1117(Oak Grove Church Road) Services revision complete.Construction <br /> by Maintenance complete. <br /> P-5701 B Construct Platform, Passenger Rail Station Building at 7/1/2024 FY2025 $7,200,000 PE funding scheduled 7/1/2020. Planning Matthew Simmons <br /> 46395.1.1 Milepost 41.7 Norfolk Southern H-line in Hillsborough and deisgn activities underway <br /> 46395.3.3 <br /> HL-0045 Repair Bridge#241 on Exchange Park Lane over Eno River 9/26/2024 FY2027 $153,800 Agreement executed, Hillsborough to Town of <br /> from South Churton Street to Faribult Lane in Hillsborough prepare environmental documents and Hillsborough/Stephen <br /> plans. Review of final plans underway. Robinson <br /> EB-5721 Upgrade existing off-road path and construct new section of 9/26/2024 FY2025 $2,400,000 Bids opened 7/17/23-Bids rejected. Town of Chapel <br /> path of Bicycle Route#1 from Cleland Drive to Willow Drive Project on Hold.Chapel Hill to seek Hill/Stephen Robinson <br /> in Chapel Hill additional funding and relet at a future <br /> date. <br /> EL-4828A Construct Morgan Creek Greenway Phase 1 in Carrboro 10/24/2024 FY2026 $372,000 Review comments provided to Carrboro in Town of <br /> June 2023 for revisions and resubmittal. Carrboro/Stephen <br /> Resubmittal under review. Robinson <br /> C-5181 Jones Creek Greenway Project-Fill Gap between the 11/21/2024 FY2026 $654,000 Environmental document approved Town of <br /> Carrboro Upper Bolin Trail and Twin Creeks Greenway and 8/14/23. NCDOT to review plans once Carrboro/Stephen <br /> also implement program to support on-vehicle trips to Morris Carrboro develops and submits. Robinson <br /> Grove Elementary School <br /> HS-2007J Install a new crosswalk with Rapid Rectangular Flashing 11/21/2024 6/30/2025 $300,000 Planning and deisgn activities underway Suzana Matts <br /> Beacons(RRFB), raised center island,pedestrian signage, <br /> and approximately 125 linear feet of sidewalk on NC 86 at <br /> Critz Drive in Chapel Hill <br /> Page 1 DCHCMPO Aug 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.