Orange County NC Website
New Roadway Widening Score <br /> Calculation <br /> Change in Volume / Change in <br /> � 43% Improve Access and Capacity Volume = Total_Flow <br /> Connectivity Capacity = �CAP_E <br /> � (Between FYB and FYNB) <br /> �• Relative change in VC ratios Maximum of all AB and <br /> � 50% Manage Congestion BA AM and PM VOCE <br /> (Between FYB and FYNB) values <br /> C6 <br /> � �/ Change in Truck Vol Truck Vol = <br /> Improve Freight movement CV+MUT+SUT <br /> � (Between FYB and FYNB) <br /> For New Roadways, the Build Volumes and VC Ratios were separately normalized and <br /> redistributed within the rest of the list. <br /> Maximum possible roadway score will be 100 <br />