Browse
Search
8-7-24 PB Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2024
>
8-7-24 PB Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 9:25:48 AM
Creation date
8/1/2024 9:15:19 AM
Metadata
Fields
Template:
BOCC
Date
8/7/2024
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
210 <br /> Fire and Life Elizabeth Farnan <br /> Safety Date: Staff: efarnan(a_orangecountync.gov <br /> 919-245-6153 <br /> No comments received. <br /> David Genwright <br /> NCDOT Date: Staff: digenwrigh�ncdot.gov <br /> 336-570-6833 <br /> 1. Rezoning request appears to be taking place off NCDOT maintained road. It also <br /> appears to not be proposing any new structures. With that, no NCDOT action or <br /> a roval is required. <br /> , _- Patrick Mallett <br /> Planning Date: 7/8/24 Staff: Pmallett(a)orangecountync.gov <br /> 919-245-2577 <br /> No comment <br /> Matt Taylor <br /> Solid Waste Date: Staff: mtaylor orangecountync.gov <br /> 919-918-4905 <br /> No comments received. <br /> Stormwater Christopher Sandt <br /> Management Date: 7/9/2024 Staff: csandt(a_orangecountync.gov <br /> 919-245-2583 <br /> 1. The project is located in the Upper Eno Protected Watershed Overlay District. <br /> Stormwater Management is required if proposed Land-Disturbing Activity exceeds <br /> 21,780 square feet. <br /> Transportation Darlene Weaver <br /> Services Date: 7/2/2024 Staff: dweaver(@orangecountync.gov <br /> 919-245-2002 <br /> No comment <br />
The URL can be used to link to this page
Your browser does not support the video tag.