Orange County NC Website
Docusign Envelope ID:A0400265-F3F7-4308-BB98-2C447EA2C29C <br /> 16 <br /> Continue to follow up after go-live for any post go-live action items, such as pending interfaces, <br /> conversion items, or anything else that was not completed <br /> Travel includes up to one onsite meeting a month during the project. It includes being onsite for go live <br /> week as needed. <br /> OPTION: Provide ongoing annual support for account and technical needs if that option is chosen by the <br /> agency <br /> The rest of this page intentionally left blank <br /> Page 14 of 19 <br />