Browse
Search
OTHER-2024-053 Construction Contract Award for Passmore Center HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Various Documents
>
2020 - 2029
>
2024
>
OTHER-2024-053 Construction Contract Award for Passmore Center HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2024 3:34:32 PM
Creation date
7/30/2024 3:33:34 PM
Metadata
Fields
Template:
BOCC
Date
6/18/2024
Meeting Type
Business
Document Type
Contract
Agenda Item
8-r
Document Relationships
Agenda - 06-18-2024; 8-r - Construction Contract Award for Passmore Center HVAC Replacement
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 06-18-2024 Business Meeting
Agenda for June 18, 2024 BOCC Meeting
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 06-18-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 19E6621B-D4D8-44A4-91A7-513B87CF541C <br /> G BRADY <br /> Exclusions <br /> 1. Any airflow issues identified during pre-TAB shall be noted as a pre-existing condition and <br /> repairs to bring airflow up to design standards due to pre-existing conditions are excluded. <br /> 2. Controls shall be provided by a third-party direct to owner <br /> 3. Any deviations from the "Passmore Senior Center HVAC Replacement 95% ME Review <br /> Drawing Set" provided by PDC Engineering dated 5.19.2023 are excluded. <br /> 4. No owner's contingency is included in this proposal <br /> 5. Any structural modifications to the building are excluded <br /> 6. Any fire protection services beyond those identified in this proposal are excluded <br /> 7. Any modifications to roof drainage or plumbing is excluded <br /> 8. Any modifications to the roof are excluded <br /> Price <br /> FEE COST <br /> Passmore Center RTU Replacements $405,465 <br /> 401 Kitty Hawk Drive, Morrisville, NC 27560 — Tel: 866.328.2764 — bradyservices.com <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.