Browse
Search
OTHER-2024-053 Construction Contract Award for Passmore Center HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Various Documents
>
2020 - 2029
>
2024
>
OTHER-2024-053 Construction Contract Award for Passmore Center HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2024 3:34:32 PM
Creation date
7/30/2024 3:33:34 PM
Metadata
Fields
Template:
BOCC
Date
6/18/2024
Meeting Type
Business
Document Type
Contract
Agenda Item
8-r
Document Relationships
Agenda - 06-18-2024; 8-r - Construction Contract Award for Passmore Center HVAC Replacement
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 06-18-2024 Business Meeting
Agenda for June 18, 2024 BOCC Meeting
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 06-18-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 19E6621B-D4D8-44A4-91A7-513B87CF541C <br /> G BRADY <br /> Scope of Work <br /> At the Jerry M. Passmore Senior Center, located at 103 Meadowlands Dr, Hillsborough, NC 27278, Brady <br /> will perform the following scope of work in accordance with the "Passmore Senior Center HVAC <br /> Replacement 95% ME Review Drawing Set" provided by PDC Engineering dated 5.19.2023. <br /> 1. Demolish and remove RTU-3, RTU-4, RTU-5, RTU-6 and RTU-7. <br /> 2. Demolish and remove EF-1, EF-2, EF-3 and SF-1. <br /> 3. Demolish and remove IDU-1. <br /> 4. Provide (1) 7.5T RTU to replace RTU-3, (2) 10T RTUs to replace RTU-4 and RTU-5, and (2) <br /> 5T RTUs to replace RTU-6 and RTU-7. <br /> 5. Provide new EF-1, EF-2, EF-3, SF-1 and IDU-1. <br /> 6. Provide mechanical installation services required to install new equipment <br /> 1. Replace existing RTU 3,6,7 with new units <br /> 2. Furnish and install all supply ductwork and transitions needed to connect the new <br /> RTU-4 and RTU-5 to the existing supply air distribution system. <br /> 3. Furnish and install all return ductwork and transition as needed to connect the new <br /> RTU-4 and RTU-5 to the existing ducted air return system. <br /> 4. Replace EF-1, EF-2, EF-3, SF-1 and IDU-1 with new units. <br /> 7. Provide electrical installation services required to install new equipment. <br /> 1. Disconnect existing power wiring. <br /> 2. Replace service disconnect. <br /> 3. Replace flexible sealtight conduit and wire from new disconnects and units <br /> 8. Provide crane and rigging to remove the existing equipment and to install the new <br /> equipment <br /> 9. Provide new curb adapters for each RTU. <br /> 10. Provide an onsite superintendent and dedicated project manager. <br /> 11. Provide pre-TAB and post-installation TAB services. <br /> 12. Remove and re-install existing duct detectors where required. <br /> 13. Pull all required permits to install the new equipment. <br /> 14. Payment and performance bonds shall be provided <br /> 15. Internal commissioning shall be provided, and coordination with the owner's third-party <br /> commissioning agent is included. <br /> 401 Kitty Hawk Drive, Morrisville, NC 27560 — Tel: 866.328.2764 — bradyservices.com <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.