Browse
Search
2024-441-E-Planning Dept-Christopher Sandt-need County Manager e-signature for our 2024 Community Rating System Annual Recertification Report, to be submitted to the State
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-441-E-Planning Dept-Christopher Sandt-need County Manager e-signature for our 2024 Community Rating System Annual Recertification Report, to be submitted to the State
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2024 2:45:44 PM
Creation date
7/30/2024 2:45:41 PM
Metadata
Fields
Template:
Contract
Date
7/26/2024
Contract Starting Date
7/26/2024
Contract Ending Date
7/29/2024
Contract Document Type
Contract
Amount
$0.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Community ORANGE COUNTY * State NC CID 370342 <br /> <br />COMMUNITY RATING SYSTEM ANNUAL RECERTIFICATION <br /> <br />Community Certifications CC-213-2 Edition: 2017 <br />CRS Activity 510 <br />Annual Progress Report on Implementation of Credited Plan <br /> <br />Which Plan is this for (use separate templates for each credited Plan): <br /> Floodplain Management Plan (Hazard Mitigation Plan) <br /> Repetitive Loss Area Analysis <br /> Floodplain Species Plan <br /> Substantial Damage Plan <br /> <br />Name of Community: <br /> <br />Date this Annual Progress Report was prepared (not the date of adoption of the credited <br />Plan): <br /> <br />Name of Plan: <br /> <br />Date of Adoption of Plan: <br /> <br />5 Year CRS Expiration Date: <br /> <br />1. How can a copy of the credited Plan be obtained: <br /> <br />2. Describe how this annual progress report (not the credited Plan) was prepared and <br />how it was submitted to the governing body, released to the media, and made available <br />to the public: <br /> <br /> <br />3. Provide a description of the implementation of each recommendation or action item in <br />the action plan or area analysis report, including a statement on how the project was im- <br />plemented or not implemented during the previous year: <br /> <br /> <br />4. Discuss why any objectives were not reached or why implementation is behind schedule: <br /> <br />5. What are the recommendations for new projects or revised recommendations? <br /> <br /> <br /> <br />Docusign Envelope ID: F4A6BD21-4B77-4093-85D6-1B93433178DE
The URL can be used to link to this page
Your browser does not support the video tag.