Orange County NC Website
• Continue to follow up after go-live for any post go-live action items, such as pending interfaces, <br />conversion items, or anything else that was not completed <br />• Travel includes up to one onsite meeting a month during the project. It includes being onsite for go live <br />week as needed. <br />• OPTION: Provide ongoing annual support for account and technical needs if that option is chosen by the <br />agency <br /> <br /> <br />The rest of this page intentionally left blank <br /> <br />Page 14 of 19 <br />16 <br />Docusign Envelope ID: A0400265-F3F7-4308-BB98-2C447EA2C29C