Browse
Search
2024-403-E-DEAPR-McQueen Construction-Construct a mini park
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-403-E-DEAPR-McQueen Construction-Construct a mini park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2024 2:06:41 PM
Creation date
7/30/2024 2:05:59 PM
Metadata
Fields
Template:
Contract
Date
7/1/2024
Contract Starting Date
7/1/2024
Contract Ending Date
7/10/2024
Contract Document Type
Contract
Amount
$288,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Perry Hills Mini-Park <br />118 Lancaster Rd, Mebane, NC <br /> <br />Addenda #2 <br />May 25, 2024 <br /> <br />MODIFICATIONS TO THE CONTRACT DOCUMENTS FOR THE ABOVE-NAMED PROJECT SHALL BE MADE <br />AS DESCRIBED BELOW AND SHALL BE INCLUDED IN THE BID AMOUNTS. <br /> <br />A. Clarifica&ons <br />1. See Aachment entled “ConstruconContractOver250k-Construcon-Final01-24 (2)LD”. <br />This contract includes a spulaon for Liquidated d amages (see page 4). This contract will <br />supersede the contract in Addenda #1. Per the Orange County Aorney Liquidated damages <br />for this contract shall be in the amount of $500.00 per day. <br />B. Ques&ons <br />1. Is there a provision to waste any excess soil on site? Answer- No there is not an area to <br />waste excess soil on site. <br />2. Do you have a Land Disturbance Permit? Answer- No, per the Orange County Unified <br />Development Ordinance recreaonal projects with lan d disturbance under 21,780 sq. =. are <br />exempt. On the approved Cover Sheet please note this project has a land disturbance area <br />of 21,458.58 sq., the State of NC does not require Erosion Control Permits for public money <br />projects under 1 acre of grading. <br />3. Who pays for soil compacon and concrete tesng for the project? Answer- Orange County <br />will pay for both soil compacon and concrete tesn g with a private tesng company. The <br />contractor will be responsible for quality control over the products he uses. <br />4. Will a Building Permit be required for the Picnic Shelter? Answer yes, the General Contrator <br />will need to obtain and pay for an Orange County Building Permit. <br /> <br />C. Drawings – Revised (5-24-24) <br />Drawing SD-1 Tree Protecon, Grading and Erosion Control: Revis ed 12” RCP on Driveway Note <br />to say 15”HDPE. (Revision shown in red.) <br />A3achments: <br />ConstruconContractOver250k-Construcon-Final01-24 (2)LD <br />Revised Drawings SD-1 (5-24-2024) <br /> <br />End of Addenda #2 <br />Docusign Envelope ID: 687B9CC7-F1BC-43DB-A291-A8D859EFA3B2
The URL can be used to link to this page
Your browser does not support the video tag.