Browse
Search
2024-403-E-DEAPR-McQueen Construction-Construct a mini park
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-403-E-DEAPR-McQueen Construction-Construct a mini park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2024 2:06:41 PM
Creation date
7/30/2024 2:05:59 PM
Metadata
Fields
Template:
Contract
Date
7/1/2024
Contract Starting Date
7/1/2024
Contract Ending Date
7/10/2024
Contract Document Type
Contract
Amount
$288,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
37 <br /> <br />Revised 01/24 <br /> <br />hours for systems necessary to normal operation of the building and within seventy-two (72) <br />hours for all other items. All special guarantees applicable to definite parts of the Work that may <br />be shown in or required by Contract Documents shall be subject to the terms of this paragraph <br />during the first year of the life of such special guarantee. Manufacturer's standard guarantees or <br />warranties which do not comply with the time limit specified herein shall be extended by the <br />Contractor automatically without further action on the part of the Owner or the Designer. <br /> <br />18.4 In the eleventh calendar month after the date of Substantial Completion, and at the request <br />of the Owner, the Contractor, the Owner and the Designer shall make an inspection of the Work <br />for the purpose of identifying defective workmanship or materials. If the Contractor, having been <br />requested to do so by the Owner, fails to participate in such inspection, the Contractor shall be <br />conclusively bound by any decision or ruling by the Designer as to any defective workmanship <br />or material and as to the Contractor's responsibility for its repair or replacement. <br /> <br />ARTICLE 19. OWNER'S RIGHT TO DO WORK <br /> <br />19.1 If, during the progress of the Work or during any period of guarantee, the Contractor fails to <br />prosecute the Work properly or to perform any provision of the Contract Documents, the Owner, <br />after three (3) days written notice to the Contractor from the Designer, or from the Owner after <br />Final Payment, may perform or have performed that portion of the Work and may deduct the <br />cost thereof from any amounts due or to become due the Contractor. Notwithstanding any <br />action by the Owner under this paragraph, all warranties and bonds given or to be given by the <br />Contractor shall remain in effect or shall be given by the Contractor. <br /> <br />19.2 Should the cost of such action by the Owner exceed the amount due or to become due the <br />Contractor, the Contractor and his sureties shall be liable for and shall pay to the Owner the <br />amount of such excess. <br /> <br />ARTICLE 20. PARTIAL PAYMENTS <br /> <br />20.1 Within thirty (30) days after his initial receipt of the Construction Contract for signatures, <br />the Contractor shall submit to the Designer a Schedule of Values. The Schedule of Values shall <br />indicate the value of the Work, including applicable overhead and profit, for each Division and <br />section of the Project Specifications. The Designer and Owner shall be provided with the <br />Contractor's estimate papers, Subcontractor agreements, supplier quotes, or other documents <br />substantiating these values if so requested in writing by the Designer. The Contractor shall <br />provide the requested documentation within seven (7) days after receipt of the Designer's <br />written request. The Schedule of Values shall be subject to approval by the Owner, and if the <br />Owner and the Contractor cannot agree upon the Schedule of Values, the Designer shall <br />prepare it, and the Schedule of Values as prepared by the Designer shall be binding on the <br />Owner and the Contractor. No Request for Payment shall be certified by the Designer until the <br />Designer has issued approval of said Schedule of Values. <br /> <br />20.2 Not later than the fifth (5th) day of each calendar month the Contractor shall submit to the <br />Designer a Request for Payment for Work done during the previous calendar month. The <br />Request for Payment shall be in form of AIA Document G702 (latest edition) and shall show <br />substantially the value of Work done (including the value of material delivered to the Project or <br />stored by the Contractor at another site, subject to the conditions hereinafter set forth) during <br />Docusign Envelope ID: 687B9CC7-F1BC-43DB-A291-A8D859EFA3B2
The URL can be used to link to this page
Your browser does not support the video tag.