Orange County NC Website
Attachment A <br />Bid Proposal Form: Perry Hills Mini-Park (rev. 5-17-2024) <br />The contractor agrees to furnish all materials, labor, and any other supplies or equipment necessary to complete the <br />above work, for the sum of: <br />$263,000.00 <br />$ 25,000 <br />$ 288,000.00 <br />Bid <br />Contingency <br />Unit Pricing Required: <br />$_300.00 _Bulk rock removal (CY) <br />$.96.00 Unsuitable soil removal and replacement <br />with off-site soil (CY) <br />$ 146.00 Unsuitable soil removal and replacement <br />with crushed stone (CY) <br />$ 100.00 _ Additional tree removal up to 8" cal (per) <br />Total BID <br />? All work must be completed within 180 days of the project start date (approx. July 15, 2024) (anticipated <br />completion January 15, 2025). <br />?Contractor is willing to participate in the County's "Docusign" digital contracting process and enter into a <br />standard contract with the County. <br />?No proposal may be withdrawn after the scheduled closing time and date for the receipt of Bids for a period <br />of (60) sixty days. <br />McQueen Construction Inc <br />(Name of firm or corporation making bid) <br />En DAt <br />Signature <br />Name: Ernest Say DeStina <br />Print or type <br />Title -VIcePres. <br />(Owner/Partner/Pres./V.Pres) <br />Address 4 Orion Circle <br />Rougemont NC 27572 <br />License No._36982 <br />Federal I.D. No. _56-1971928 <br />Email Address:SayDeflina@gmail.com <br />Addendum(s) received and used in computing bid: (Check or date beside each addendum your firm using for computing <br />your bid) <br />Addendum No. 1 _Addendum No. 2 X Addendum No. 3 Addendum No. 4 <br />Orange County Bid Page #4 Rev 2024-02 <br />Docusign Envelope ID: 687B9CC7-F1BC-43DB-A291-A8D859EFA3B2