Browse
Search
2024-390-E-AMS-Brady Services-WCOB Server Room HVAC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-390-E-AMS-Brady Services-WCOB Server Room HVAC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2024 1:56:17 PM
Creation date
7/30/2024 1:54:37 PM
Metadata
Fields
Template:
Contract
Date
7/10/2024
Contract Starting Date
7/10/2024
Contract Ending Date
7/15/2024
Contract Document Type
Contract
Amount
$146,290.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MBGuidelines 2002 - iii- <br />c. Reviewing the apparent low bidders' statutory compliance with the requirements listed in the <br />proposal, that must be complied with, if the bid is to be considered as responsive, prior to award <br />of contracts. The State reserves the right to reject any or all bids and to waive informalities. <br />d. Reviewing of minority business requirements at Preconstruction conference. <br />e. Monitoring of contractors’ compliance with minority business requirements in the contract <br />documents during construction. <br />f. Provide statistical data and required reports to the HUB Office. <br />g. Resolve any protest and disputes arising after implementation of the plan, in conjunction with the <br />HUB Office. <br /> <br />3. Owner <br />Before awarding a contract, owner shall do the following: <br /> <br />a. Develop and implement a minority business participation outreach plan to identify minority <br />businesses that can perform public building projects and to implement outreach efforts to <br />encourage minority business participation in these projects to include education, recruitment, and <br />interaction between minority businesses and non-minority businesses. <br />b. Attend the scheduled prebid conference. <br />c. At least 10 days prior to the scheduled day of bid opening, notify minority businesses that have <br />requested notices from the public entity for public construction or repair work and minority <br />businesses that otherwise indicated to the Office for Historically Underutilized Businesses an <br />interest in the type of work being bid or the potential contracting opportunities listed in the <br />proposal. The notification shall include the following: <br />1. A description of the work for which the bid is being solicited. <br />2. The date, time, and location where bids are to be submitted. <br />3. The name of the individual within the owner’s organization who will be available to <br />answer questions about the project. <br />4. Where bid documents may be reviewed. <br />5. Any special requirements that may exist. <br />d. Utilize other media, as appropriate, likely to inform potential minority businesses of the bid <br />being sought. <br />e. Maintain documentation of any contacts, correspondence, or conversation with minority business <br />firms made in an attempt to meet the goals. <br />f. Review, jointly with the designer, all requirements of G.S. 143-128.2(c) and G.S. 143-128.2(f) – <br />(i.e. bidders’ proposals for identification of the minority businesses that will be utilized with <br />corresponding total dollar value of the bid and affidavit listing good faith efforts, or affidavit of <br />self-performance of work, if the contractor will perform work under contract by its own <br />workforce) - prior to recommendation of award to the State Construction Office. <br />g. Evaluate documentation to determine good faith effort has been achieved for minority business <br />utilization prior to recommendation of award to State Construction Office. <br />h. Review prime contractors’ pay applications for compliance with minority business utilization <br />commitments prior to payment. <br />i. Make documentation showing evidence of implementation of Owner’s responsibilities available <br />for review by State Construction Office and HUB Office, upon request <br /> <br />4. Designer <br />Under the single-prime bidding, separate prime bidding, construction manager at risk, or alternative <br />contracting method, the designer will: <br /> <br />a. Attend the scheduled prebid conference to explain minority business requirements to the <br />prospective bidders. <br />b. Assist the owner to identify and notify prospective minority business prime and subcontractors <br />of potential contracting opportunities. <br />c. Maintain documentation of any contacts, correspondence, or conversation with minority business <br />firms made in an attempt to meet the goals. <br />d. Review jointly with the owner, all requirements of G.S. 143-128.2(c) and G.S.143-128.2(f) – <br />(i.e. bidders’ proposals for identification of the minority businesses that will be utilized with <br />Docusign Envelope ID: 8DED1454-68D2-4E36-9FC6-E56FF2124E5D
The URL can be used to link to this page
Your browser does not support the video tag.