Browse
Search
2024-390-E-AMS-Brady Services-WCOB Server Room HVAC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-390-E-AMS-Brady Services-WCOB Server Room HVAC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2024 1:56:17 PM
Creation date
7/30/2024 1:54:37 PM
Metadata
Fields
Template:
Contract
Date
7/10/2024
Contract Starting Date
7/10/2024
Contract Ending Date
7/15/2024
Contract Document Type
Contract
Amount
$146,290.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br />R <br />WALL RATINGS LEGEND <br />2 HR RATED WALL <br />4 HR RATED WALL <br />1 HR RATED WALL <br />CU-2 <br />EX.EGEN1 EX.EGEN2 <br />EX.SL-32,34,36 <br />1 <br />COMPUTER ROOM BELOW <br />ON THE THRID FLOOR <br />ELECTRICAL ROOM BELOW <br />ON THE THIRD FLOOR <br />GFI <br />WP EX. <br />1 <br />2 <br />3 <br />0 8' 16' 32' <br />1/8" = 1'-0" <br />ROOF POWER PLAN1 <br />KEYNOTES <br />1. PROVIDE ROOFING CONDUIT BOOT AND PENETRATE ROOFING. COORDINATE <br />ALL WORK AS REQUIRED WITH ROOFING MANUFACTURE. ROUTE BRANCH <br />CIRCUIT CONDUIT/WIRE IN CEILING BELOW. ROUTE FROM PENETRATION <br />ABOVE THIRD FLOOR CEILING TO THE LOCATION OF THE THIRD FLOOR <br />ELECTRICAL ROOM. CORE BORE FLOOR AS NECESSARY TO MOUNT AND <br />ROUTE CONDUIT/WIRE TO REACH THE EXISTING PANEL SL ON THE GROUND <br />FLOOR. <br />2. BOTH THE THIRD FLOOR CRAC UNIT AND ROOF CU UNIT SHALL BE <br />CONNECTED TO THE EXISTING EMERGENCY POWER OFF SYSTEM. PROVIDE <br />ALL NECESSARY CONTROL MODULES AND CONNECT TO THE EXISTING <br />SUPPRESSION SYSTEM AND THE BUILDING FIRE ALARM SYSTEMS. FIELD <br />VERIFY ACTUAL SHUTDOWN SYSTEMS UTILIZED. <br />3. DISCONNECT FURNISHED WITH EQUIPMENT. REFER TO MECHANICAL <br />EQUIPMENT SCHEDULES. <br />DRAWN BY:CHECKED <br />BY: <br />REVISIONS <br />TBUTKOVICH@PDCENGINEERS.COM <br />ORANGE COUNTY WEST OFFICE BUILDINGHVAC UPGRADEROOF POWER <br />PLAN <br />E2.03 <br />BID/PERMIT <br />ORANGE COUNTYTWB JTB <br />PDC 23020 02/20/2024 <br />NUMBER DATE DESCRIPTION <br />GENERAL NOTES: <br />A. REFER TO ELECTRICAL LEAD SHEET E0.00 FOR SYMBOLS, ABBREVIATIONS AND <br />NOTES. <br />B. THE ELECTRICAL CONTRACTOR SHALL COORDINATE ANY AND ALL WORK WITH <br />OWNER, PRIOR TO INSTALLATION OF THE NEW EQUIPMENT, SO TO AVOID <br />CONFLICTS DURING CONSTRUCTION AND TO ALLOW FOR OPTIMUM <br />MAINTENANCE AND WORKING SPACE. <br />C. CONDUIT/WIRE ROUTING SHOWN IS FOR INFORMATIONAL PURPOSES ONLY, FOR <br />THE CLARIFICATION OF SCOPE. EXACT EXISTING ROUTING OR NEW <br />INSTALLATION SHALL BE FIELD VERIFIED. <br />D. REFER TO PANEL SCHEDULES FOR ALL BREAKER AND CONDUIT/WIRE SIZES. <br />02/20/2024 <br />Docusign Envelope ID: 8DED1454-68D2-4E36-9FC6-E56FF2124E5D
The URL can be used to link to this page
Your browser does not support the video tag.