Orange County NC Website
1. NOTIFY THE OWNER, IN WRITING, AT LEAST 7 DAYS IN ADVANCE OF ALL REQUIRED SHUTDOWNS <br />ELECTRICAL UTILITIES. UPON WRITTEN RECEIPT OF APPROVAL FROM OWNER, SHUTDOWNS SHALL <br />BE PERFORMED AS DIRECTED BY THE OWNER AND SHALL BE CONDUCTED AT NO ADDITIONAL <br />CONTRACT COST. AT THE COMPLETION OF EACH SHUT DOWN, ALL SERVICES SHALL BE RESTORED <br />SO THAT NORMAL OPERATION OF ALL UTILITIES CAN RESUME. <br />2. WHEN WORKING IN AND AROUND THE EXISTING BUILDING, EXTREME CARE SHALL BE EXERCISED IN <br />REGARDS TO PROTECTION OF THE EXISTING STRUCTURE, MECHANICAL AND ELECTRICAL SERVICES <br />WHICH WILL REMAIN. REPAIR, REPLACE OR RESTORE TO THE SATISFACTION OF THE <br />OWNER/ARCHITECT/ENGINEER ALL EXISTING WORK DAMAGED IN THE PERFORMANCE OF <br />DEMOLITION AND/OR NEW WORK. <br />3. ALL EXISTING WIRING, EQUIPMENT, CONDUITS AND MATERIALS NOT REQUIRED FOR RE-USE OR RE- <br />INSTALLATION (SHOWN OR OTHERWISE) SHALL BE REMOVED. ALL EXISTING MATERIALS AND <br />EQUIPMENT WHICH ARE REMOVED AND DESIRED BY THE OWNER, OR ARE INDICATED TO REMAIN AS <br />THE PROPERTY OF THE OWNER, SHALL BE DELIVERED TO THE OWNER ON THE PREMISES BY THE <br />CONTRACTOR WHERE DIRECTED BY THE ARCHITECT. ALL OTHER MATERIALS AND EQUIPMENT <br />WHICH ARE REMOVED SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE <br />REMOVED BY THE CONTRACTOR FROM THE PREMISES. <br />4. EXISTING CONDITIONS (PRESENCE AND LOCATION OF PANELBOARDS, LIGHTING FIXTURES, <br />RECEPTACLES, EQUIPMENT, MATERIALS AND CIRCUITING) INDICATED ARE BASED ON INFORMATION <br />OBTAINED FROM AVAILABLE RECORD DRAWINGS AND FIELD SURVEYS AND ARE NOT WARRANTED <br />TO BE COMPLETE OR CORRECT. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF ALL <br />CONDUITS, EQUIPMENT AND MATERIALS IN THE FIELD PRIOR TO STARTING ALL WORK. <br />5. EXISTING EQUIPMENT SIZES NOTED ARE FOR THE CONVENIENCE OF THE CONTRACTOR ONLY AND <br />ARE NOT WARRANTED TO BE CORRECT. CONTRACTOR SHALL VERIFY ALL SIZES IN THE FIELD IF <br />EQUIPMENT IS IN PROJECT SCOPE. <br />6. WHEN EXISTING MECHANICAL AND ELECTRICAL WORK IS REMOVED, ALL CONDUITS, WIRING AND <br />MATERIALS SHALL BE REMOVED TO A POINT BELOW FINISHED FLOORS OR BEHIND FINISHED WALLS <br />AND CAPPED. SUCH POINTS SHALL BE FAR ENOUGH BEHIND FINISHED SURFACES TO ALLOW FOR <br />THE INSTALLATION OF THE NORMAL THICKNESS OF FINISHED MATERIAL. <br />7. EXISTING MECHANICAL AND ELECTRICAL EQUIPMENT, CONDUIT, WIRING, DEVICES, AND MATERIALS <br />AFFECTED BY DEMOLITION OR NEW WORK INSTALLATION AND REQUIRED TO REMAIN IN SERVICE <br />SHALL BE REINSTALLED OR SUPPORTED AS REQUIRED IN ACCORDANCE WITH NEW WORK <br />SPECIFICATIONS. ALL WORK SHALL BE COMPLETED TO THE SATISFACTION OF THE OWNER. <br />8. IN GENERAL, ON DEMOLITION DRAWINGS, ALL EQUIPMENT AND MATERIALS SHOWN "LIGHT" ARE <br />EXISTING TO REMAIN AND ALL EQUIPMENT AND MATERIALS SHOWN AS "HEAVY AND DASHED" ARE <br />EXISTING TO BE DEMOLISHED. <br />9. ENSURE THAT ALL ELECTRICAL WORK IS DONE DE-ENERGIZED. SPECIFICALLY WHERE ELECTRICAL <br />EQUIPMENT IS OPENED EXPOSING LIVE PARTS, BREAKERS ARE REMOVED OR INSTALLED OR <br />WHERE ELECTRICAL CONNECTIONS ARE MODIFIED. ALL POWER AT THE PANEL OR ENCLOSURE <br />SHALL BE DE-ENERGIZED AT ITS SOURCE, PRIOR TO WORK BEING DONE. <br />10. ALL TESTING, TROUBLESHOOTING AND VERIFICATION OF DEENERGIZATION IS TO BE DONE IN <br />ACCORDANCE WITH NFPA 70E INCLUDING ESTABLISHING, ISOLATING IF REQUIRED, SHOCK <br />PROTECTIVE AND ARC FLASH PROTECTIVE APPROACH BOUNDARIES AND WEARING PERSONAL <br />PROTECTIVE EQUIPMENT APPROPRIATE FOR THE HAZARD. <br />11. PRIOR TO THE REMOVAL OF A CIRCUIT FROM A PANELBOARD, THE CONTRACTOR SHALL VERIFY <br />THAT NO EXISTING LOADS REMAIN ON THAT CIRCUIT. IF UNEXPECTED LOADS REMAIN ON THE <br />CIRCUIT, NOTIFY EOR FOR DIRECTIONS TO PROCEED. ONCE CIRCUITS HAVE BEEN VERIFIED TO BE <br />UNDER NO LOAD, BREAKERS IN THE CORRESPONDING PANELBOARD SHALL BE FLIPPED TO THE <br />'OFF' POSITION AND MARKED AS SPARE AND READY FOR FUTURE WORK. ALL CONDUIT AND WIRING <br />SHALL BE REMOVED BACK TO SOURCE. <br />12. UPDATE PANEL SCHEDULES TO REFLECT NEW AND CHANGED LOAD. ALL PANEL SCHEDULES SHALL <br />BE COMPUTER GENERATED. <br />13. EXISTING FIRE ALARM SYSTEM SHALL BE MAINTAINED AND OPERABLE DURING DEMOLITION. <br />CONTRACTOR SHALL TEMP EXISTING DEVICES TO ALLOW DEMOLITION OF EXISTING CONDUIT AND <br />WIRING. <br />DEMOLITION NOTES:ABBREVIATIONS <br />ABBREV. <br />A <br />AC <br />A/C <br />ADA <br />AFF <br />AFG <br />AIC <br />AL <br />ANSI <br />ATSC <br />ATS <br />A/V <br />AWG <br />BAS <br />BFC <br />C <br />CB <br />CCTV <br />CKT <br />CT <br />CU <br />D <br />DB <br />DC <br />DL <br />DISC <br />E <br />ECB <br />EWC <br />EX <br />FUT <br />FA <br />FACP <br />FATC <br />FDR <br />GAA <br />GAP <br />GEN <br />GEC <br />GFI <br />GFCI <br />GFEP <br />GFP <br />GND <br />GRS <br />HH <br />HOA <br />HP <br />IEEE <br />IG <br />KCMIL <br />KV <br />KVA <br />KW <br />KWH <br />LC <br />LS <br />LSIG <br />MAX <br />MCB <br />MCC <br />MDP <br />MIN <br />MH <br />MLO <br />MTS <br />N/A <br />NC <br />NEC <br />NEMA <br />N or NEUT <br />NFPA <br />NIC <br />NO <br />O/H <br />P <br />PA <br />PB <br />PC <br />PH <br />PT <br />RC <br />RSC <br />SEC <br />SPD <br />SW <br />SWBD <br />SWGR <br />TC <br />TEMP <br />TGB <br />TGMB <br />TTB <br />TV <br />TYP. <br />U/C <br />U/G <br />UGE <br />UL <br />UON <br />UPS <br />V <br />VFD <br />WG <br />WP <br />XFER <br />XFMR <br />DEFINITION <br />AMPS, AMPERE, AMPERAGE <br />ABOVE COUNTER <br />ALTERNATING CURRENT <br />AMERICANS WITH DISABILITIES ACT <br />ABOVE FINISHED FLOOR <br />ABOVE FINISHED GRADE <br />AMPERE INTERRUPTING CURRENT <br />ALUMINUM <br />AMERICAN NATIONAL STANDARD INSTITUTE <br />AUTOMATIC TRANSFER SWITCH CONTROL <br />AUTOMATIC TRANSFER SWITCH <br />AUDIO/VISUAL <br />AMERICAN WIRE GAUGE <br />BUILDING AUOTMATION SYSTEM <br />BELOW FINISHED CEILING <br />CONDUIT <br />CIRCUIT BREAKER <br />CLOSED CIRCUIT TELEVISION <br />CIRCUIT <br />CURRENT TRANSFORMER <br />COPPER <br />DIMMING OR DIMMER <br />DISTRIBUTION BOARD <br />DIRECT CURRENT <br />DAY-LIGHTING <br />DISCONNECT SWITCH <br />EMERGENCY <br />ENCLOSED CIRCUIT BREAKER <br />ELECTRIC WATER COOLER <br />EXISTING <br />FUTURE <br />FIRE ALARM <br />FIRE ALARM CONTROL PANEL <br />FIRE ALARM TERMINAL CABINET <br />FEEDER <br />GENERATOR ALARM ANNUNCIATOR <br />GENERATOR ALARM PANEL <br />GENERATOR <br />GROUNDING ELECTRODE CONDUCTOR <br />GROUND FAULT INTERRUPTER <br />GROUND FAULT CIRCUIT INTERRUPTER <br />GROUND FAULT EQUIPMENT PROTECTION <br />GROUND FAULT PROTECTION <br />GROUND <br />GALVANIZED RIGID STEEL <br />HAND HOLE <br />HAND-OFF AUTOMATIC <br />HORSEPOWER <br />INSTITUE OF ELECTRICAL AND ELECTRONICS ENGINEERS <br />ISOLATED GROUND <br />THOUSAND CIRCULAR MILS <br />KILOVOLT <br />KILOVOLT AMPS <br />KILOWATT <br />KILOWATT HOURS <br />LIGHTING CONTACTOR <br />LOUD SPEAKER <br />LONG TIME, SHORT TIME, INSTANTANEOUS AND GROUND <br />FAULT PROTECTION <br />MAXIMUM <br />MAIN CIRCUIT BREAKER <br />MOTOR CONTROL CENTER <br />MAIN DISTRIBUTION PANEL <br />MINIMUM <br />MAN HOLE <br />MAIN LUGS ONLY <br />MANUAL TRANSFER SWITCH <br />NOT APPLICABLE <br />NORMALLY CLOSED <br />NATIONAL ELECTRIC CODE <br />NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION <br />NEUTRAL <br />NATIONAL FIRE PROTECTION ASSOCIATION <br />NOT IN CONTRACT <br />NORMALLY OPEN <br />OVER HEAD <br />POLE <br />PUBLIC ADDRESS <br />PULL BOX <br />PHOTOCELL <br />PHASE POTENTIAL TRANSFORMER <br />POTENTIAL TRANSFORMER <br />RECEPTACLE CONTACTOR <br />RIGID STEEL CONDUIT <br />SECURITY <br />SURGE PROTECTIVE DEVICE <br />SWITCH <br />SWITCHBOARD <br />SWITCHGEAR <br />TIME CLOCK <br />TEMPORARY <br />TECHNOLOGY GROUND BAR <br />TECHNOLOGY MAIN GROUND BAR <br />TELEPHONE TERMINAL BOARD <br />TELEVISION <br />TYPICAL <br />UNDER COUNTER <br />UNDERGROUND <br />UNDERGROUND ELECTRIC <br />UNDERWRITERS' LABORATORIES <br />UNLESS OTHERWISE NOTED <br />UNINTERRUPTABLE POWER SUPPLY <br />VOLTS, VOLTAGE <br />VARIABLE FREQUENCY DRIVE <br />WIRE GUARD <br />WEATHERPROOF <br />TRANSFER <br />TRANSFORMER <br />SYMBOL LEGEND <br />J <br />GFI <br />WP <br />DESCRIPTION REMARKS <br />EXISTING WEATHERPROOF DUPLEX GROUNDING TYPE RECEPTACLE - +16" <br />ABOVE GRADE TO BOTTOM OF OUTLET BOX, UNLESS OTHERWISE NOTED. <br />WIRING AND CONDUIT INSTALLED CONCEALED IN WALL SPACE OR <br />ABOVE FINISHED CEILING <br />HOME RUN CIRCUIT TO PANELBOARD <br />JUNCTION BOX WITH REMOVABLE COVER - SIZE PER NATIONAL <br />ELECTRICAL CODE <br />SYMBOL <br />EXISTING 120/208 VOLT PANELBOARD WITH NEUTRAL AND GROUND BUS <br />ACCESSORIES. <br />DISCONNECT SWITCH, HEAVY DUTY PROVIDED WITH EQUIPMENT <br />R RELAY FOR AIR HANDLING UNIT SHUTDOWN - UNIT SHALL SHUTDOWN <br />UPON ACTIVATION OF GENERAL FIRE ALARM ACTIVATION AND LOCAL <br />FM 200 SYSTEM ACTIVATION. SHUTDOWN SHALL BE VERIFIED UPON <br />PROJECT COMPLETION. A COMPLETED NFPA 72 RECORD OF <br />COMPLETION FORM SHALL BE PROVIDED AND SIGNED OFF AT <br />COMPLETION OF PROJECT. <br />EXISTING 277/480 VOLT PANELBOARD WITH NEUTRAL AND GROUND BUS <br />ACCESSORIES. <br />GENERAL NOTES <br />1.THE ELECTRICAL CONTRACTOR SHALL COORDINATE ANY AND ALL WORK WITH OTHER TRADES <br />INVOLVED IN THE PROJECT, PRIOR TO THE INSTALLATION OF HIS EQUIPMENT SO AS TO AVOID <br />CONFLICTS DURING CONSTRUCTION AND ALLOW FOR OPTIMUM MAINTENANCE AND WORKING SPACE. <br />2.ALL LIGHT FIXTURES SHALL BE SUPPORTED INDEPENDENTLY OF THE SUSPENDED CEILING SYSTEM. <br />REFER TO THE SPECIFICATIONS FOR MORE DETAILED INFORMATION. <br />3.USE OF THE CONDUIT SYSTEM FOR EQUIPMENT GROUNDING SHALL NOT BE ACCEPTABLE. A <br />SEPARATE GREEN GROUND WIRE SHALL RUN WITH THE CIRCUIT CONDUCTORS IN EACH CIRCUIT. <br />4.ALL FUSES, DISCONNECT SWITCHES, AND BREAKER SIZES SHOWN FOR MECHANICL EQUIPMENT <br />SHALL BE VERIFIED BEFORE THE PURCHASE OR INSTALLATION OF SAID EQUIPMENT, WITH THE <br />EQUIPMENT SUPPLIER AND MECHANICAL CONTRACTOR. <br />5.ALL WORK AND MATERIAL SHALL BE PROVIDED IN ACCORDANCE WITH STATE, LOCAL AND NATIONAL <br />CODES AND ORDINANCES. <br />6.THE NEW FIRE ALARM EQUIPMENT SHOWN SHALL BE PROVIDED IN ACCORDANCE WITH THE <br />MANUFACTURER'S REQUIREMENTS. PROVIDE ALL WIRING AS REQUIRED FOR A COMPLETE SYSTEM. <br />7.THE ELECTRICAL CONTRACTOR SHALL VERIFY ALL CEILING TYPES AND FINISHES BEFORE PURCHASE <br />OF ANY LIGHT FIXTURES SO THAT THE PROPER TRIM WILL BE PROVIDED FOR THE CEILING TO BE <br />INSTALLED. ANY DIFFERENCES SHALL BE THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR. <br />8.EACH CONTRACTOR SHALL PROVIDE HIS OWN SUPPORT OF ALL DEVICES AND EQUIPMENT PROVIDED <br />BY HIM AND SHALL SUPPORT SUCH EQUIPMENT PER APPROVED GOVERNING CODES OR PER <br />APPROVAL OF THE ENGINEER. UNACCEPTABLE WORKMANSHIP OR MATERIALS SHALL BE REPLACED <br />AT THE REQUEST OF THE ENGINEER AT THE CONTRACTOR'S EXPENSE. <br />9.ALL JUNCTION BOXES AND CONDUIT RUNS (WITH OR WITHOUT WIRES) SHALL BE COLOR CODED WITH <br />PAINT, IN ACCORDANCE WITH ELECTRICAL GENERAL PROVISIONS. <br />10.ALL WIRE AND CONDUIT SIZES ARE BASED ON 75°C THHN OR THWN WIRE UNLESS OTHERWISE NOTED. <br />11.THE LOCATION OF ALL WALL MOUNTED DEVICES, INCLUDING MOUNTING HEIGHTS, SHALL BE FIELD <br />VERIFIED WITH THE ARCHITECT PRIOR TO INSTALLATION. <br />12.WHERE MULTIPLE SWITCHES ARE SHOWN IN THE SAME LOCATION THEY SHALL BE GANGED <br />TOGETHER IN ONE MULTIPLE GANG BOX WITH MATCHING COVER AND PARTITION (IF REQUIRED). THE <br />ELECTRICAL CONTRACTOR SHALL LOOK AT BOTH POWER AND LIGHTING PLAN TO DETERMINE WHICH <br />SWITCH IS APPLICABLE. <br />13.WHERE ELECTRICAL EQUIPMENT PENETRATES EXTERIOR WALLS OR THE ROOF, THEY SHALL BE <br />PROPERLY SEALED WITH METHODS APPROVED BY THE ENGINEER. SUBMIT DETAIL OF PROPOSED <br />SEALING METHODS. <br />14.THE ELECTRICAL CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL CHAIN HUNG FIXTURES <br />LOCATED IN MECHANICAL OR OTHER SPACES WITH OTHER TRADES, SO AS NOT TO CONFLICT WITH <br />OTHER EQUIPMENT. <br />15.WHERE CONDUIT OR OUTLET BOXES CANNOT BE INSTALLED IN EXISTING WALLS FOR NEW DEVICES, <br />THEN PROVIDE AND INSTALL SURFACE MOUNTED WIREMOLD RACEWAYS. CONFIRM ALL WIREMOLD <br />WITH ARCHITECT PRIOR TO INSTALLATION. <br />16.OUTLET BOXES ON OPPOSITE SIDES OF THE FIRE RESISTANT WALL OR SHAFT ENCLOSURE RATED <br />TWO HOURS OR LESS SHALL BE SEPARATED BY A HORIZONTAL DISTANCE OF NOT LESS THAN 24" AS <br />REQUIRED BY NCSBC VOL 1 PARAGRAPH 705.4.3. <br />17.ELECTRICAL CONTRACTOR SHALL PROVIDE ALL ACCESS PANELS AS REQUIRED FOR ELECTRICAL <br />CODE COMPLIANCE AND TO ACCESS ANY INSTALLATION THAT WILL REQUIRE FUTURE MAINTENANCE. <br />THESE DOORS SHALL BE 20" X 20". EACH ROOM WITH A DRYWALL CEILING SHALL HAVE A MINIMUM OF <br />ONE ACCESS DOOR PROVIDED BY THE ELECTRICAL CONTRACTOR. THE DRYWALL SUBCONTRACTOR <br />WILL PROVIDE THE REQUIRED FRAMED OPENING AND INSTALL THE ACCESS DOORS. <br />18.CONDUCTORS FOR BRANCH CIRCUITS SHALL BE SIZED TO PREVENT VOLTAGE DROP EXCEEDING 3% <br />AT THE FARTHEST OUTLET OF POWER, HEATING AND LIGHTING LOADS, OR ANY COMBINATION OF <br />SUCH LOADS. THE MAXIMUM TOTAL VOLTAGE DROP ON BOTH FEEDERS AND BRANCH CIRCUITS TO <br />THE FARTHEST OUTLET SHALL NOT EXCEED 5%. <br />A. WHERE THE CONDUCTOR LENGTH FROM THE PANEL TO THE FIRST OUTLET ON A 120V CIRCUIT <br />EXCEED 50'-0" THE BRANCH CIRCUIT CONDUCTORS FROM THE PANEL TO THE FIRST OUTLET SHALL <br />NOT BE SMALLER THAN #10AWG. INCREASE THE BRANCH CIRCUIT CONDUCTOR SIZE AN ADDITIONAL <br />WIRE SIZE FOR EACH ADDITIONAL 125' FOR THE ENTIRE CIRCUIT. THE GROUND CONDUCTOR SIZE <br />SHALL BE INCREASED PROPORTIONALLY TO THE INCREASED PHASE CONDUCTORS AS PER NEC 2020 <br />250.122 (B). <br />B. WHERE THE CONDUCTOR LENGTH FROM THE PANEL TO THE FIRST OUTLET ON A 277V CIRCUIT <br />EXCEEDS 125'-0", THE BRANCH CIRCUIT CONDUCTORS FROM THE PANEL TO THE FIRST OUTLET SHALL <br />NOT BE SMALLER THAN #10 AWG. CONDUCTOR SIZE OF REMAINING BRANCH CIRCUIT SHALL INCREASE <br />AS NEEDED TO MEET ABOVE VOLTAGE DROP LIMITATIONS. THE GROUND CONDUCTOR SIZE SHALL BE <br />INCREASED PROPORTIONALLY TO THE INCREASED PHASE CONDUCTORS AS PER NEC 2020 250.122(B). <br />19.ELECTRICAL CONTRACTOR SHALL VISIT SITE PRIOR TO BID. THE ELECTRICAL CONTRACTOR SHALL <br />PROVIDE ALL ELECTRICAL WORK (IE RELOCATING/MOVING CONDUITS/WIRING, LIGHT FIXTURES, ETC.) <br />TO ACCOMODATE THE REPLACEMENT OF MECHANCIAL EQUIPMENT AND PIPING. CLOSE <br />COORDINATION WITH MECHANCIAL CONTRACTOR IS REQUIRED. <br />SHEET INDEX - ELECTRICAL <br />Sheet Number Sheet Name Current Revision Current Revision Date <br />E0.00 ELECTRICAL LEAD SHEET <br />E2.01 GROUND FLOOR POWER PLAN <br />E2.02 THIRD FLOOR POWER PLAN <br />E2.03 ROOF POWER PLAN <br />E5.01 RISER <br />E5.02 SCHEDULES <br />E6.01 DETAILS <br />DRAWN BY:CHECKED <br />BY: <br />REVISIONS <br />TBUTKOVICH@PDCENGINEERS.COM <br />ORANGE COUNTY WEST OFFICE BUILDINGHVAC UPGRADEELECTRICAL <br />LEAD SHEET <br />E0.00 <br />BID/PERMIT <br />ORANGE COUNTYGS JTB <br />PDC 23020 02/20/2024 <br />NUMBER DATE DESCRIPTION <br />02/20/2024 <br />Docusign Envelope ID: 8DED1454-68D2-4E36-9FC6-E56FF2124E5D