Browse
Search
2024-390-E-AMS-Brady Services-WCOB Server Room HVAC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-390-E-AMS-Brady Services-WCOB Server Room HVAC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2024 1:56:17 PM
Creation date
7/30/2024 1:54:37 PM
Metadata
Fields
Template:
Contract
Date
7/10/2024
Contract Starting Date
7/10/2024
Contract Ending Date
7/15/2024
Contract Document Type
Contract
Amount
$146,290.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County West Campus Office Building -HVAC <br />PDC Project 23020 BAS DIRECT DIGITAL CONTROL <br />SYSTEM 23 09 02 - 2 <br />A.The BMS contractor shall maintain a service organization consisting of factory trained service <br />personnel and provide a list of 10 projects,similar in size and scope to this project,completed <br />within the last five years. <br />B.Materials and equipment shall be the catalogued products of manufacturers regularly engaged in <br />production and installation of automatic temperature control systems and shall be manufacturer's <br />latest standard design that complies with the specification requirements. <br />C.All BAS peer-to-peer network controllers,central system controllers,and local user displays shall <br />be UL Listed under Standard UL 916,category PAZX;Standard ULC C100;and under Standard <br />UL 864 and be so listed at the time of bid.All floor level controllers shall comply,at a minimum, <br />with UL Standard UL 916;Standard UL 864 and be so listed at the time of Bid. <br />1.05 SUBMITTALS <br />A.Product Submittal Requirements.Meet requirements of Submittal Section on Shop Drawings, <br />Product Data,and Samples.Provide six copies of shop drawings and other submittals on <br />hardware,software,and equipment to be installed or furnished.Begin no work until submittals <br />have been approved for conformity with design intent.Provide drawings as AutoCAD 2004 (or <br />newer)compatible files on optical disk (file format:.dwg,.dxf,.vsd,or comparable)or hard copies <br />on 11”x 17”prints of each drawing.When manufacturer’s cut sheets apply to a product series <br />rather than a specific product,clearly indicate applicable data by highlighting or by other means. <br /> Clearly reference covered specification and drawing on each submittal.General catalogs shall not <br />be accepted as cut sheets to fulfill submittal requirements. Select and show submittal quantities <br />appropriate to scope of work. Also include contractor Sequence of Operations as programmed. <br />1.06 WARRANTY <br />A.Warrant labor and materials for specified control system free from defects for a period of 12 <br />months after final acceptance.Failures on control systems that include all computer equipment, <br />transmission equipment and all sensors and control devices during warranty period shall be <br />adjusted,repaired,or replaced at no additional cost or reduction in service to Owner. <br />B.Work shall have a single warranty date,even if Owner receives beneficial use due to early system <br />start-up.If specified work is split into multiple contracts or a multi-phase contract,each contract or <br />phase shall have a separate warranty start date and period. <br />C.Exception: <br />1.Contractor shall not be required to warrant reused devices,except those that have been <br />rebuilt or repaired.Installation labor and materials shall be warranted.Demonstrate operable <br />condition of reused devices at time of Engineer’s acceptance. <br />2.Contractor shall not be required to warrant systems,equipment and devices or software if the <br />damages and/or failures were caused by lack of training,unauthorized use,negligence or <br />deliberate action of other parties,or job site conditions. <br />1.07 OWNERSHIP OF PROPRIETARY MATERIAL <br />A.Project specific software and documentation shall become Owner’s property.This includes,but not <br />limited to: <br />1.Graphics <br />2.Record drawings <br />3.Database <br />4.Application programming code <br />PART 2 PRODUCTS <br />2.01 GENERAL <br />A.All products used in this project installation shall be new and currently manufactured and shall <br />have been applied in similar installations.Do not use this installation as a product test site unless <br />explicitly approved in writing by Owner or Owner's representative.Spare parts shall be available <br />for at least five years after completion of this contract. <br />2.02 COMMUNICATION <br />Docusign Envelope ID: 8DED1454-68D2-4E36-9FC6-E56FF2124E5D
The URL can be used to link to this page
Your browser does not support the video tag.