Orange County NC Website
Orange County West Campus Office Building -HVAC <br />PDC Project 23020 Testing,Adjusting,and Balancing for <br />HVAC 23 05 93 - 8 <br />D.Heating Coils: <br />1.Identification/number. <br />2.Location. <br />3.Manufacturer. <br />4.Air flow,design and actual. <br />5.Water flow,design and actual. <br />6.Water pressure drop,design and actual. <br />7.Entering water temperature,design and actual. <br />8.Leaving water temperature,design and actual. <br />9.Entering air temperature,design and actual. <br />10.Leaving air temperature,design and actual. <br />11.Air pressure drop,design and actual. <br />E.Air Moving Equipment: <br />1.Location. <br />2.Manufacturer. <br />3.Model number. <br />4.Air flow,specified and actual. <br />5.Return air flow,specified and actual. <br />6.Outside air flow,specified and actual. <br />7.Total static pressure (total external),specified and actual. <br />8.Inlet pressure. <br />9.Discharge pressure. <br />10.Fan RPM. <br />F.Duct Traverses: <br />1.System zone/branch. <br />2.Duct size. <br />3.Design air flow. <br />4.Test velocity. <br />5.Test air flow. <br />6.Duct static pressure. <br />7.Air temperature. <br />G.Air Distribution Tests: <br />1.Air terminal number. <br />2.Room number/location. <br />3.Terminal type. <br />4.Terminal size. <br />5.Design air flow. <br />6.Test (final)air flow. <br />7.Percent of design air flow. <br />END OF SECTION 23 05 93 <br />Docusign Envelope ID: 8DED1454-68D2-4E36-9FC6-E56FF2124E5D