Orange County NC Website
Orange County West Campus Office Building -HVAC <br />PDC Project 23020 Sleeves and Sleeve Seals for HVAC <br />Piping 23 05 17 - 3 <br />2.Provide sealing elements of the size,quantity,and type required for the piping and sleeve <br />inner diameter or penetration diameter. <br />3.Locate piping in center of sleeve or penetration. <br />4.Install field assembled sleeve-seal system components in annular space between sleeve and <br />piping. <br />5.Tighten bolting for a water-tight seal. <br />6.Install in accordance with manufacturer's recommendations. <br />H.When installing more than one piping system material,ensure system components are compatible <br />and joined to ensure the integrity of the system. Provide necessary joining fittings. Ensure <br />flanges,union,and couplings for servicing are consistently provided. <br />3.03 CLEANING <br />A.Upon completion of work,clean all parts of the installation. <br />B.Clean equipment,pipes,valves,and fittings of grease,metal cuttings,and sludge that may have <br />accumulated from the installation and testing of the system. <br />END OF SECTION 23 05 17 <br />Docusign Envelope ID: 8DED1454-68D2-4E36-9FC6-E56FF2124E5D