Browse
Search
2024-390-E-AMS-Brady Services-WCOB Server Room HVAC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-390-E-AMS-Brady Services-WCOB Server Room HVAC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2024 1:56:17 PM
Creation date
7/30/2024 1:54:37 PM
Metadata
Fields
Template:
Contract
Date
7/10/2024
Contract Starting Date
7/10/2024
Contract Ending Date
7/15/2024
Contract Document Type
Contract
Amount
$146,290.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County West Campus Office Building -HVAC <br />PDC Project 23020 HVAC GENERAL PROVISIONS 23 01 00 - 7 <br />A.The Contractor shall prepare a PDF version of the manual describing the proper maintenance and <br />system operation. This manual shall not consist of standard factory printed data intended for <br />dimension or design purposes (although these may be included),but shall be prepared to describe <br />this particular job. This manual shall include the following: <br />1.A check list for periodic maintenance of all equipment. <br />2.Suggested setting of all controls and switches for normal operation,with description of control <br />and its location. <br />3.A check list for seasonal shutdown. <br />4.Maintenance and spare parts data for each major piece of equipment. <br />5.As-built wiring,interlock and control diagrams for equipment with color coding shown on <br />wiring and interlock diagrams. <br />6.Air and Water Balance Report. <br />B.The PDF shall be indexed,bookmarked,dated and signed by the Contractor when completed. <br />C.The operating and maintenance manuals shall be submitted to the Engineer for approval.When <br />the manuals are considered complete by the Engineer,they will be turned over to the Owner for <br />their permanent use. <br />D.For each major piece of equipment,the Contractor shall organize and record on video the on-site <br />training sessions.A copy of the video shall be turned over to the Owner at the completion of the <br />project. <br />END OF SECTION 23 01 00 <br />Docusign Envelope ID: 8DED1454-68D2-4E36-9FC6-E56FF2124E5D
The URL can be used to link to this page
Your browser does not support the video tag.