Browse
Search
2024-390-E-AMS-Brady Services-WCOB Server Room HVAC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-390-E-AMS-Brady Services-WCOB Server Room HVAC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2024 1:56:17 PM
Creation date
7/30/2024 1:54:37 PM
Metadata
Fields
Template:
Contract
Date
7/10/2024
Contract Starting Date
7/10/2024
Contract Ending Date
7/15/2024
Contract Document Type
Contract
Amount
$146,290.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County West Campus Office Building -HVAC <br />PDC Project 23020 HVAC GENERAL PROVISIONS 23 01 00 - 6 <br />3.06 FIELD QUALITY CONTROL <br />A.The Contractor shall conform to the requirements of Division 3 for concrete testing. <br />B.All testing required for compliance with the Contract shall be as stated in subsequent sections. <br />3.07 ADJUST AND CLEAN <br />A.All equipment and installed materials shall be thoroughly clean and free of all dirt,oil,grit,grease, <br />etc. <br />B.Clean piping and ductwork both internally and externally to remove dirt,dust,debris,and other <br />foreign matter.When external surfaces of piping are rusted,clean and restore surface to original <br />condition. <br />C.Clean all equipment as recommended by the manufacturer. <br />D.Factory painted equipment shall not be repainted unless damaged areas exist. These areas shall <br />be touched up with a material suitable for intended service. In no event shall name plates be <br />painted. <br />E.Dirt,dust,and other foreign matter shall be blown and/or cleaned from coils,terminal devices, <br />diffusers,registers,and grilles.Inspect all coils and comb coil fins where damaged to as-new <br />condition prior to test and balance work. <br />F.If the Owner has doubts or concerns about the cleanliness of the ductwork or air handling systems, <br />the Owner reserves the right to have a third-party assessment performed by a board certified <br />indoor environmental consultant to determine if the installation meets requirements as stipulated in <br />the National Air Duct Cleaners Association (NADCA)Assessment,Cleaning,and Restoration of <br />HVAC Systems.If duct systems or air handling units are found to have accumulated dirt or foreign <br />matter on interior surfaces in violation of NADCA guidelines,the Contractor shall be responsible <br />for all costs required to restore the air distribution system to new condition to the satisfaction of the <br />Owner.This shall include payment for all costs associated with third party testing of the systems. <br />G.At a scheduled meeting,the Contractor shall instruct the Owner or the Owner's representative in <br />the operation and maintenance of all equipment installed under his Contract (in the presence of <br />the Engineer). <br />H.Equipment with filter media shall be run for a period of two (2)weeks after completion of work at <br />which time a new filter media shall be installed with one change of filter media provided the Owner <br />for future replacement. (Provide a total of three (3)sets). <br />I.The Contractor shall adjust the tension on all belts six months after the final inspection. <br />3.08 TESTING AND BALANCING <br />A.Tests for equipment,ductwork,piping,and other systems shall be performed as specified in their <br />respective sections in accordance with technical requirements indicated. <br />B.Provide equipment and devices required for testing,including fittings for additional openings as <br />required for the test apparatus. <br />C.All ductwork and piping inspections and testing shall be successfully completed with test reports <br />reviewed and approved by the Engineer before concealment or application of covering materials. <br />D.Testing shall be witnessed by the Engineer,unless otherwise indicated.Notify Engineer,Owner, <br />Commission Authority,and other parties at least 72 hours in advance of testing date.Engineer,at <br />his discretion,may opt not to witness a given test.In this case,The Construction Manager/General <br />Contractor and/or CxA shall witness the test and forward results to Engineer for review. <br />E.Contractor shall be responsible for certifying in writing all equipment and system test results. <br />Certification shall include identification of portion of system tested,date,time,weather conditions, <br />test criteria,testing medium,and pressure used,duration of test,and name and title of person <br />signing test certification document.Results shall be submitted to Engineer within three (3)days of <br />test completion. <br />3.09 MAINTENANCE AND OPERATING MANUAL <br />Docusign Envelope ID: 8DED1454-68D2-4E36-9FC6-E56FF2124E5D
The URL can be used to link to this page
Your browser does not support the video tag.