Browse
Search
2024-390-E-AMS-Brady Services-WCOB Server Room HVAC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-390-E-AMS-Brady Services-WCOB Server Room HVAC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2024 1:56:17 PM
Creation date
7/30/2024 1:54:37 PM
Metadata
Fields
Template:
Contract
Date
7/10/2024
Contract Starting Date
7/10/2024
Contract Ending Date
7/15/2024
Contract Document Type
Contract
Amount
$146,290.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County West Campus Office Building -HVAC <br />PDC Project 23020 HVAC GENERAL PROVISIONS 23 01 00 - 3 <br />C.Within ten days after notification of the award of the Contract and written notice to begin work,the <br />Contractor shall submit to the Architect/Engineer for approval a detailed list of equipment and <br />material which he proposes to use. Items requiring submittal data for approval will be noted at this <br />time. <br />D.Mark general catalog sheets and drawings to indicate specific items submitted and their correlation <br />to specific tagged equipment on the drawings.Cross out all nonapplicable or extraneous <br />information that does not apply to the submitted equipment.Circle or otherwise clearly indicate <br />applicable options. <br />E.Contractor shall clearly indicate deviations (if any)from the project specifications on each <br />submittal.Shop drawings accepted by the Engineer shall not relieve the Contractor of their <br />responsibility to construct the work in accordance with the Contract Documents. <br />F.Include proper identification of equipment or item by name and/or number,as indicated on the <br />Drawings. <br />G.Where manufacturer's reference numbers differ from those specified,clearly indicate such on the <br />submittal. <br />H.Where equipment or items specified include accessories,parts,and additional items under one <br />designation,submittals shall be complete and include all required components. <br />I.Equipment requiring electrical connections shall include composite wiring diagrams,motor <br />efficiency,and power factor data.Wiring diagrams submitted shall be specific to project conditions. <br />J.Where submittals cover products containing non-metallic materials,include MSDS sheets from the <br />manufacturer stating physical and chemical properties of components and precautionary steps to <br />be taken. <br />K.The Contractor shall provide an electronic PDF copy of submittal data. The pdf shall contain <br />complete submittal data on all products,methods,etc.proposed for use on the project. <br />L.Each submittal shall bear the approval of the Contractor indicating that he has reviewed the data <br />and found it to meet the requirements of the specifications as well as space limitations and other <br />project conditions. The submittals shall be clearly identified showing project name,manufacturer's <br />catalog number,and all necessary performance and fabrication data. <br />M.The Contractor shall submit to the Engineer a set of accurately marked up plans indicating all <br />changes encountered during the construction. Final payment will be contingent on receipt of these <br />as-built plans. <br />N.The Contractor shall furnish an electronic PDF copy of maintenance and operating instructions as <br />outlined in Paragraph C (Execution),of this specification section. <br />O.The Contractor shall submit to the Owner all certificates required for operating system in <br />compliance with local,state and federal regulations. <br />1.06 PRODUCT DELIVERY,STORAGE AND HANDLING <br />A.All material and equipment shall be delivered and unloaded by the Contractor within the project <br />site as noted herein or as directed by the Owner. <br />B.The Contractor shall protect all material and equipment from breakage,theft,or weather damage. <br /> No material or equipment shall be stored on the ground. <br />C.The material and equipment shall remain the property of the Contractor until the project has been <br />completed and turned over to the Owner. <br />1.07 WORK CONDITIONS AND COORDINATION <br />A.The Contractor shall review the electrical plans to establish points of connection and the extent of <br />electrical work to be provided in his Contract. All electrical work shall be performed by a licensed <br />electrical contracting firm. <br />B.This Contractor shall be responsible for the final electrical connections to all equipment installed as <br />part of his contract. <br />Docusign Envelope ID: 8DED1454-68D2-4E36-9FC6-E56FF2124E5D
The URL can be used to link to this page
Your browser does not support the video tag.