Orange County NC Website
GENERAL NOTES SYMBOL LEGEND <br />SYMBOL DESCRIPTION <br />ABBREVIATIONS <br />MECHANICAL SUMMARY <br />MECHANICAL SYSTEMS, SERVICE SYSTEMS AND EQUIPMENT <br />CODE <br />2018 NC ENERGY CODE: PRESCRIPTIVE ___X___ PERFORMANCE _______ <br />ASHRAE 90.1-2013: PRESCRIPTIVE _______ PERFORMANCE _______ <br />ADDITIONAL PRESCRIPTIVE COMPLIANCE: N/A <br />_____ 506.2.1 MORE EFFICIENT MECHANICAL EQUIPMENT <br />_____ 506.2.2 REDUCED LIGHTING POWER DENSITY <br />_____ 506.2.3 ENERGY RECOVERY VENTILATION SYSTEMS <br />_____ 506.2.4 HIGHER EFFICIENCY SERVICE WATER HEATING <br />_____ 506.2.5 ON-SITE SUPPLY OF RENEWABLE ENERGY <br />_____ 506.2.6 AUTOMATIC DAYLIGHTING CONTROLS <br />THERMAL ZONE: 4A <br />WINTER DRY BULB: 20.0 DEGREES F <br />SUMMER DRY BULB: 94.6 DEGREES F <br />SUMMER WET BULB: 74.3 DEGREES F <br />SUMMER HR/MCDB: 129.5 / 81.2 DEGREES F <br />INTERIOR DESIGN CONDITIONS <br />WINTER DRY BULB: 70 DEGREES F <br />SUMMER DRY BULB: 75 DEGREES F <br />RELATIVE HUMIDITY: 55 % <br />BUILDING HEATING LOAD: EXISTING <br />BUILDING COOLING LOAD: EXISTING (ADDING CRAC UNIT FOR REDUNDANCY ONLY) <br />MECHANICAL SPACING CONDITIONING SYSTEM <br />UNITARY <br />DESCRIPTION OF UNIT: REFER TO SCHEDULE ON DRAWINGS <br />HEATING EFFICIENCY: REFER TO SCHEDULE ON DRAWINGS <br />COOLING EFFICIENCY: REFER TO SCHEDULE ON DRAWINGS <br />SIZE CATEGORY OF UNIT: REFER TO SCHEDULE ON DRAWINGS <br />BOILER: TOTAL BOILER OUTPUT. IF OVERSIZED, STATE REASON. EXISTING <br />CHILLER: TOTAL CHILLER CAPACITY. IF OVERSIZED, STATE REASON. EXISTING <br />REFER TO EQUIPMENT SCHEDULES FOR UNIT EFFICIENCIES. <br />DESIGNER STATEMENT: <br />TO THE BEST OF MY KNOWLEDGE AND BELIEF, THE DESIGN OF THIS BUILDING COMPLIES WITH THE <br />MECHANICAL SYSTEMS, SERVICE SYSTEMS AND EQUIPMENT REQUIREMENTS OF THE NORTH CAROLINA <br />STATE ENERGY CODE <br />SUPPLY DUCT <br />RETURN DUCT <br />BALANCING DAMPER <br />OUTSIDE AIR INTAKE <br />DUCT SMOKE DETECTOR <br />R R <br />C C <br />T# <br />TEMPERATURE SENSOR. LABEL INDICATES UNIT CONTROLLED. <br />REFRIGERANT PIPING <br />CONDENSATE PIPING <br />_ x _ <br />_ x _ <br />_ x _ <br />FIRE DAMPER. 1.5 HOUR FOR 1 HR AND 2HR CONSTRUCTION, 3 HOUR FOR 3 HR <br />CONSTRUCTION. TYPE B WITH BLADES OUT OF AIR STREAM. UL 555 LISTED. <br />PROVIDE FACTORY SLEEVE. PROVIDE MULTI-SECTION ASSEMBLY AS REQUIRED <br />FOR DUCT DIMENSIONS. PROVIDE THIN-LINE MODEL OR OUT OF WALL MODEL <br />WHERE APPROPRIATE. <br />FD <br />SD <br />POINT OF DISCONNECTION / DEMOLITION <br />POINT OF CONNECTION <br />MECHANICAL ABBREVIATIONS <br />ACCU AIR COOLED CONDENSING UNIT <br />ACU AIR CONDITIONING UNIT <br />AD ACCESS DOOR <br />AF AIR FILTER <br />AFF ABOVE FINISHED FLOOR <br />AHU AIR HANDLING UNIT <br />ALUM ALUMINUM <br />AMP AMPERE <br />AP ACCESS PANEL <br />ARCH ARCHITECTURAL <br />AVG AVERAGE <br />CC AIR COLLED CONDENSER <br />B BOILER <br />B.I. BLACK IRON <br />BB BASEBOARD RADIATION <br />BDD BACKDRAFT DAMPER <br />BHP BRAKE HORSEPOWER <br />BO BLANK OFF <br />BTU BRITISH THERMAL UNIT <br />BTUH BRITISH THERMAL UNITS PER HOUR <br />CA COMPRESSED AIR <br />CAP CAPACITY <br />CAU COMPRESSED AIR <br />CC COOLING COIL <br />CFM CUBIC FEET PER MINUTE <br />CH CHILLER <br />CI CAST IRON <br />CL CENTER LINE <br />CO CARBON MONOXIDE <br />CO CLEAN OUT <br />CONC CONCRETE <br />CT COOLI NG TOWER <br />CU CONDENSING UNIT <br />CUH CABINET UNIT HEATER <br />CV CONSTANT VOLUME <br />CY CYCLE <br />DB DRY BULB TEMPERATURE <br />DELF DEFLECTION <br />DIFF DIFFUSER <br />DN DOWN <br />DWG DRAWING <br />DX DIRECT EXPANSION <br />EA EACH <br />EAT ENTERING AIR TEMPERATURE <br />EF EXHAUST FAN <br />EFF EFFICIENCY <br />EHC ELECTRIC HEAT COIL <br />ESP EXTERNAL STATIC PRESSURE <br />ET EXPANSION TANK <br />EUH ELECTRIC UNIT HEATER <br />EWT ENTERING WATER TEMPERATURE <br />EXH EXHAUST <br />F.D. FLOOR DRAIN <br />FA FREE AREA <br />FCU FAN COIL UNIT <br />FD FIRE DAMPER <br />FLEX FLEXIBLE <br />FM FLOW METER <br />FP FAN POWERED BOX <br />FPM FEET PER MINUTE <br />FT FEET <br />FT2 SQUARE FEET <br />FT3 CUBIC FEET <br />°F DEGREES FARENHEIT <br />GA GAUGE <br />GC GENERAL CONTRACTOR <br />GE GENERAL EXHAUST <br />GPM GALLONS PER MINUTE <br />GR GRILLE <br />*H ENTHAPLY DIFFERENCE <br />HC HEATING COIL <br />HORIZ HORIZONTAL <br />HP HORSEPOWER <br />HR HOUR <br />HU HUMIDIFIER <br />HVAC HEATING VENTILATION & AIR <br />CONDITIONING <br />HX HEAT EXCHANGER <br />SHEET INDEX - MECHANICAL <br />Sheet <br />Number Sheet Name Current <br />Revision <br />Current <br />Revision Date <br />M0.00 LEAD SHEET <br />M1.01 DEMOLITION PLAN - THIRD FLOOR <br />M2.01 DUCTWORK AND PIPING PLAN - THIRD FLOOR <br />M2.02 ROOF PLAN <br />M5.01 DETAILS <br />M5.02 UL DETAILS <br />M7.01 MECHANICAL SCHEDULES <br />1. THE CONTRACT DOCUMENTS ARE COMPLIMENTARY AND WHAT IS REQUIRED BY ONE SHALL BE AS BINDING AS IF <br />REQUIRED BY ALL. IN THE CASE OF A CONFLICT, DISAGREEMENT, OR AMBIGUITY, PROVIDE THE BETTER QUALITY. IN THE <br />CASE OF A CONFLICT, DISAGREEMENT, OR AMBIGUITY, PROVIDE THE GREATER QUANTITY OF WORK. <br />2. COORDINATE ALL WORK WITH THAT OF THE OTHER DISCIPLINES PRIOR TO THE INSTALLATION OF ANY PIPING, <br />DUCTWORK, OR EQUIPMENT. <br />3. PERFORM A COMPLETE REVIEW OF THE CONTRACT DOCUMENTS PRIOR TO INSTALLATION OF THE MECHANICAL <br />SYSTEMS AND REVIEW ANY CONFLICTS WITH THE ENGINEER. <br />4. DURING THE CONSTRUCTION PROCESS, PROTECT ALL EQUIPMENT, DEVICES, DUCTWORK, PIPING, AND <br />APPURTENANCES FROM DIRT, DEBRIS, AND RAIN. STORE IN A COVERED LOCATION OFF OF THE FLOOR AND ABOVE <br />STANDING WATER. ITEMS FOUND LYING IN STANDING WATER ON THE JOB SITE WILL NOT BE ACCEPTED FOR <br />INSTALLATION. <br />5. ENSURE THAT ITEMS TO BE FURNISHED OR PROVIDED WILL FIT IN THE SPACE AVAILABLE. MAKE NECESSARY FIELD <br />MEASUREMENTS TO ASCERTAIN SPACE REQUIREMENTS, INCLUDING THOSE FOR CONNECTIONS, AND PROVIDE SUCH <br />SIZES AND SHAPES OF EQUIPMENT THAT ARE THE TRUE INTENT AND MEANING OF THE CONTRACT DOCUMENTS. <br />PROVIDE THE ENGINEER WITH SCALED COORDINATION DRAWINGS OF ALL MECHANICAL SPACES AND ABOVE CEILING <br />INSTALLATIONS. <br />6. LOCATE ALL EQUIPMENT TO PROVIDE MAXIMUM SPACE FOR MAINTENANCE AND SERVICE. <br />7. PROVIDE ALL ELECTRICAL AND CONTROL CONNECTIONS TO THE EQUIPMENT PROVIDED. REFER TO THE ELECTRICAL <br />DRAWINGS FOR LOCATIONS OF JUNCTION BOXES, DISCONNECTS, CIRCUIT BREAKERS (PANELBOARDS). TYPE, SIZE, AND <br />NUMBER OF CONDUCTORS AND CONDUITS TO EQUIPMENT SHALL BE EQUIVALENT TO THE CONDUCTORS AND <br />CONDUITS PROVIDED BY DIVISION 26. IN CASE OF MECHANICAL EQUIPMENT CONNECTION TO A CIRCUIT BREAKER, THE <br />NUMBER AND SIZE OF THE CONDUCTORS AND CONDUITS SHALL CONFORM TO THE LATEST NATIONAL ELECTRICAL <br />CODE REGULATIONS. ALL MOTOR STARTERS, SWITCHES, CONTROL DEVICES, ETC., PROVIDED BY DIVISION 23 SHALL BE <br />RECESSED IN THE WALLS, EXCEPT WHEN THESE ITEMS ARE LOCATED IN MECHANICAL SPACES. PROVIDE A NAMEPLATE <br />FOR ALL EQUIPMENT, SWITCHES, CONTROL DEVICES, ETC. REFER TO THE GENERAL PROVISIONS SECTION OF THE <br />DIVISION 23 SPECIFICATIONS. <br />8. PROVIDE ALL SUPPORT DEVICES NECESSARY FOR THE WORK. COORDINATE ALL LOCATIONS WITH OTHER DISCIPLINES <br />PRIOR TO INSTALLATION. <br />9. DO NOT SCALE THESE DRAWINGS. FIELD CONFIRM ALL DIMENSIONS. <br />10. PROVIDE ALL PENETRATIONS PERTAINING TO THE WORK THROUGH THE ROOF, WALLS, AND FLOORS. PROVIDE THE <br />WATERPROOFING AROUND THE OPENINGS. <br />11. COORDINATE THE SIZE AND LOCATION OF ALL PENETRATIONS THROUGH THE ROOF WITH EXISTING CONDITIONS AND <br />THE AUTHORIZED ROOFER TO MAINTAIN WARRANTIES. <br />12. FIRE SEAL ALL FLOOR AND FIRE WALL PIPE AND CONDUIT PENETRATIONS WITH A UL APPROVED METHOD. <br />13. PROVIDE ALL CUTTING AND PATCHING OF FLOORS AND WALLS FOR THE WORK UNLESS OTHERWISE INDICATED. <br />14. ALL WALL AND FLOOR PENETRATIONS SHALL BE SEALED. SEAL ALL RATED FLOOR AND WALL PENETRATIONS WITH A UL <br />APPOVED METHOD. FOR NON-RATE WALLS AND FLOORS, THE ANNULAR SPACE SHALL BE PACKED WITH MINERAL <br />WOOL, OR ANOTHER SUITABLE NON-COMBUSTIBLE MATERIAL, AND CAULKED AIR RIGHT. <br />15. CONDENSATE DRAINS SHALL BE A MINIMUM OF 1"∅COPPER, INSULATED WITH A 25/50 RATED CLOSED CELL RUBBER <br />TUBING HAVING A NOMINAL WALL THICKNESS OF 1". PROVIDE A P-TRAP WITH VENT AND CLEANOUT PLUG AT THE UNIT. <br />ALL CONDENSATE LINES SHALL BE ROUTED TO A FLOOR DRAIN OR AS INDICATED ON THE DRAWINGS. <br />16. DUCT DIMENSIONS SHOWN ARE INSIDE CLEAR UNLESS OTHERWISE INDICATED. <br />17. PROVIDE FLEXIBLE DUCT CONNECTORS AT SUPPLY, RETURN, AND EXHAUST DUCTWORK CONNECTIONS TO ALL AIR <br />HANDLING UNITS AND FANS. <br />18. PROVIDE SHEET METAL COLLAR AT ALL LOCATIONS WHERE DUCTS PENETRATE WALLS. COLLARS SHALL BE OF A GAGE <br />EQUIVALENT TO THE DUCTWORK. <br />19. ALL ACCESS DOORS IN THE DUCTWORK SHALL BE LOCATED TO EASILY ACCESS FIRE DAMPERS. COORDINATE CEILING <br />ACCESS PANEL LOCATIONS WITH ALL OTHER DISCIPLINES. ALL ACCESS DOORS IN DUCTWORK FOR FIRE DAMPERS, <br />DUCT-MOUNTED COILS, CONTROL DAMPERS, HUMIDIFIERS, DUCT SMOKE DETECTORS, AND OTHER DEVICES SHALL <br />CONFORM TO THE FOLLOWING SCHEDULE: <br />DUCT WIDTH ACCESS DOOR SIZE <br />UP TO 17" WIDE 16"x12" (OR AS LARGE AS POSSIBLE) <br />18" TO 22" 16"x16" <br />22" AND LARGER 18"x18" <br />20. INSTALL THERMOSTATS, SENSORS, AND OTHER CONTROLS 48" ABOVE FINISHED FLOOR OR AS INDICATED ON THE <br />DRAWINGS. COORDINATE WITH OTHER DISCIPLINES TO ALIGN EXACTLY WITH ADJACENT DEVICES SUCH AS LIGHT <br />SWITCHES AND CONTROLS. <br />21. PROVIDE ALL THERMOSTATS, SENSORS, CONTROLS, WIRING, AND CONDUIT. <br />22. ALL DRAWINGS ARE DIAGRAMMATIC. VISIT THE SITE, BECOME FAMILIAR WITH THE EXISTING CONDITIONS, AND <br />COORDINATE THE DUCT LAYOUT WITH ALL DISCIPLINES PRIOR TO INSTALLATION. <br />23. SUPPORT ALL DUCTWORK, PIPING, EQUIPMENT, AND APPURTENANCES FROM THE BUILDING STRUCTURE AND NOT THE <br />ROOF DECK. <br />24. ALL HANGER RODS SHALL BE CUT TO WITHIN 1" OF THE BOTTOM NUT. IN MECHANICAL ROOMS, ALL HANGERS OR <br />OTHER EQUIPMENT BELOW 7'-4" SHALL BE WRAPPED WITH FOAM INSULATION FOR PERSONNEL PROTECTION. <br />25. EQUIPMENT SHALL MEET OR EXCEED ALL REQUIREMENTS IN THE 2013 VERSION OF ASHRAE STANDARD 90.1 AND THE <br />INTERNATIONAL ENERGY CONSERVATION CODE WITH NORTH CAROLINA AMENDMENTS. <br />26. COORDINATE THE ROUGH-IN OF PIPING WITH THE GENERAL CONTRACTOR AND OTHER TRADES. <br />27. ALL PIPING SHALL BE PERMANENTLY IDENTIFIED BY CONTENT, FUNCTION, AND DIRECTION OF FLOW (I.E., HOT WATER <br />SUPPLY →). ALL IDENTIFICATION MARKERS SHALL BE PERMANENTLY STENCILED ON THE PIPING IN A LEGIBLE MANNER <br />AT NO GREATER DISTANCE THAN 10'-0" ON CENTER. <br />28. DO NOT INSTALL PIPING OR DUCTWORK OVER ANY ELECTRICAL PANEL OR SWITCHGEAR. <br />29. ZIP TIES WILL NOT BE PERMITTED FOR USE AS CABLE SUPPORTS. WHERE NOT REQUIRED TO BE INSTALLED IN <br />RACEWAY BY THE SPECIFICATION, PROVIDE J-HOOK SUPPORTS AND BRIDLE RINGS. CABLE SHALL BE INDEPENDENTLY <br />SUPPORTED AND SHALL NOT BE SUPPORTED OF THE WORK OF OTHER TRADES. <br />MECHANICAL ABBREVIATIONS <br />HZ HERTZ <br />IF INJECTION FAN <br />IN INCHES <br />INSUL INSULATION <br />ISDL ISOLATION <br />KE KITCHEN EXHAUST <br />KW KILOWATT <br />LAT LEAVING AIR TEMPERATURE <br />LBS POUNDS <br />LF LINEAR FEET <br />LLC LIQUID LEVEL CONTROLLER <br />LWT LEAVING WATER TEMPERATURE <br />MAT MIXED AIR TEMPERATURE <br />MAX MAXIMUM <br />MIN MINIMUM <br />N.C. NORMALLY CLOSED <br />N.O. NORMALLY OPEN <br />NC NOISE CRITERIA <br />NIC NOT IN CONTRACT <br />NK NECK <br />NPSH NET POSITIVE SUCTION HEAT <br />NTS NOT TO SCALE <br />OA OUTSIDE AIR <br />OAI OUTSIDE AIR INTAKE <br />OBD OPPOSED BLADE DAMPER <br />OD OUTSIDE DAMPER <br />OV OUTLET VELOCITY <br />P PUMP <br />PD PRESSURE DROP <br />PH PHASE <br />PRESS PRESSURE <br />PRV PRESSURE REDUCING VALVE <br />PSIG POUNDS PER SQUARE INCH <br />ΔP PRESSURE DIFFERENTIAL <br />RA RETURN AIR <br />REFRIG REFRIGERANT <br />REG REGISTER <br />RET RETURN <br />RF RELIEF / RETURN FAN <br />RH RELATIVE HUMIDITY <br />RM ROOM <br />RO REVERSE OSMOSIS <br />RPM REVOLUTIONS PER MINUTE <br />RTU ROOFTOP UNIT <br />SA SUPPLY AIR <br />SD SMOKE DAMPER <br />SF SUPPLY FAN <br />SM SHEET METAL <br />SP STATIC PRESSURE <br />SQ. FT. SQUARE FEET <br />SS STAINLESS STEEL <br />ST SOUND TRAP <br />T TANK <br />TC TEMPERATURE CONTROL <br />TE TOILET EXHAUST <br />TG TRANSFER GRILLE <br />TSP TOTAL STATIC PRESSURE <br />TYP TYPICAL <br />ΔT TEMPERATURE DIFFERENTIAL <br />UH UNIT HEATER <br />V VOLTAGE <br />VAV VARIABLE AIR VOLUME <br />VD VOLUME DAMPER <br />VEL VELOCITY <br />VFD VARIABLE FREQUENCY DRIVE <br />VIB VIBRATION <br />W WATT <br />WB WET BULB TEMPERATURE <br />WC WATER COLUMN <br />WMS WIRE MESH SCREEN <br />WP WORKING PRESSURE <br />DRAWN BY:CHECKED <br />BY: <br />REVISIONS <br />SCAMPBELL@PDCENGINEERS.COM <br />ORANGE COUNTY WEST OFFICE BUILDINGHVAC UPGRADELEAD SHEET <br />M0.00 <br />BID/PERMIT <br />ORANGE COUNTYJAV SWC <br />PDC 23020 02/20/2024 <br />NUMBER DATE DESCRIPTION <br />02/20/2024 <br />Docusign Envelope ID: 8DED1454-68D2-4E36-9FC6-E56FF2124E5D