Orange County NC Website
Orange County West Campus Office Building -HVAC <br />PDC Project 23020 Allowances 01 21 00 - 1 <br />SECTION 01 21 00 <br />ALLOWANCES <br />PART 1 GENERAL <br />1.01 SECTION INCLUDES <br />A.Contingency allowance. <br />1.02 CONTINGENCY ALLOWANCE <br />A.Contractor's costs for products,delivery,installation,labor,insurance,payroll,taxes,bonding, <br />equipment rental,overhead and profit will be included in Change Orders authorizing expenditure of <br />funds from this Contingency Allowance. <br />B.Funds will be drawn from the Contingency Allowance only by Change Order. <br />C.At closeout of Contract,funds remaining in Contingency Allowance will be credited to Owner by <br />Change Order. <br />1.03 ALLOWANCES SCHEDULE <br />A.Contingency Allowance: Include the stipulated sum/price of $​​5,000​​for use upon Owner's <br />instructions. <br />PART 2 PRODUCTS -NOT USED <br />PART 3 EXECUTION -NOT USED <br />END OF SECTION 01 21 00 <br />Docusign Envelope ID: 8DED1454-68D2-4E36-9FC6-E56FF2124E5D