Browse
Search
2024-384-E-AMS-National Power-Piedmont Food Processing Center - Provide and Install Generator
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-384-E-AMS-National Power-Piedmont Food Processing Center - Provide and Install Generator
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2024 1:50:47 PM
Creation date
7/30/2024 1:50:07 PM
Metadata
Fields
Template:
Contract
Date
7/13/2024
Contract Starting Date
7/13/2024
Contract Ending Date
7/15/2024
Contract Document Type
Contract
Amount
$19,200.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SG100 | 9.0L | 100 kW <br />INDUSTRIAL SPARK-IGNITED GENERATOR SET <br />EPA Certified Stationary Emergency <br />SPEC SHEET1 of 6 <br />DEMAND RESPONSE READY <br />Image used for illustration purposes only <br />Standby Power Rating <br />100 kW, 125 kVA, 60 Hz <br />Prime Power Rating* <br />90 kW, 113 kVA, 60 Hz <br />Powering Ahead <br />Generac ensures superior quality by designing and <br />manufacturing most of its generator components, such <br />as alternators, enclosures, control systems and <br />communications software. Generac also makes its own <br />spark-ignited engines, and you’ll find them on every <br />Generac gaseous-fueled generator. We engineer and <br />manufacture them from the block up — all at our <br />facilities throughout Wisconsin. Applying natural gas <br />and LP-fueled engines to generators requires advanced <br />engineering expertise to ensure reliability, durability and <br />necessary performance. By designing specifically for <br />these dry, hotter-burning fuels, the engines last longer <br />and require less maintenance. Building our own <br />engines also means we control every step of the supply <br />chain and delivery process, so you benefit from single- <br />source responsibility. <br />Plus, Generac Industrial Power’s distribution network <br />provides all parts and service so you don’t have to deal <br />with third-party suppliers. It all leads to a positive <br />owner experience and higher confidence level. Generac <br />spark-ignited engines give you more options in <br />commercial and industrial generator applications as <br />well as extended run time from utility-supplied natural <br />gas. <br />Codes and Standards <br />Not all codes and standards apply to all configurations. Contact <br />factory for details. <br />UL2200, UL6200, UL1236, UL489 <br />CSA C22.2 <br />BS5514 and DIN 6271 <br />SAE J1349 <br />NFPA 37, 70, 99, 110 <br />NEC700, 701, 702, 708 <br />ISO 3046, 7637, 8528, 9001 <br />NEMA ICS10, MG1, 250, ICS6, AB1 <br />ANSI C62.41 <br />IBC 2009, CBC 2010, IBC 2012, <br />ASCE 7-05, ASCE 7-10, <br />ICC-ES AC-156 (2012) <br />TM <br />® <br />® <br />*Assembled in the USA using <br />domestic and foreign parts <br />*EPA Certified Prime ratings are not available in the US or its Territories <br />Docusign Envelope ID: 2F58BEE5-DDBE-42EB-8DFA-5E2508488B04
The URL can be used to link to this page
Your browser does not support the video tag.