Browse
Search
2024-342-E-AMS-Tryon Ventures NC LLC dba Signarama of Durham-Whitted Crosswalk Signage
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-342-E-AMS-Tryon Ventures NC LLC dba Signarama of Durham-Whitted Crosswalk Signage
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2024 10:08:57 AM
Creation date
7/29/2024 10:08:50 AM
Metadata
Fields
Template:
Contract
Date
6/23/2024
Contract Starting Date
6/23/2024
Contract Ending Date
6/26/2024
Contract Document Type
Contract
Amount
$3,250.50
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.3 U-Channel 12ft 2lbs Galvanized - U-Channel <br />2.4 Installation by item (non-ADA) - Install <br />3 Installation Mobilization Fee 1 $155.52 $155.52 $155.52 <br />Install Site: 300 W Tryon St, Hillsborough, NC 27278 <br />*Client to complete 811 Call-in, Mark, Flags <br />3.1 Installation Mobilization - Local - <br />Subtotal:$3,023.72 <br />Taxable Amount:$3,023.72 <br />Taxes:$226.78 <br />Grand Total:$3,250.50 <br />Amount Paid:$0.00 <br />BALANCE DUE:$3,250.50 <br />TURNAROUND TIMES: <br />Our company's mission is to produce your signage as quickly as possible. We <br />make every effort to complete the manufacturing of your custom signage <br />within a 5 to 8 business day window following design approval. Current supply <br />chain disruptions and the variability in manufacturing capacity due to Covid <br />protocols makes standard turn-around times very challenging. For orders <br />requiring installation, in general expect an additional 5 to 10 business days to <br />complete. <br />We work at the pleasure of our customers. Please speak with your sales <br />representative when you have a hard deadline that needs to be met. <br />Guaranteed rush orders are available on quick turn signage manufactured in <br />our main fabrication department. Additional fees apply. Please ask your sales <br />representative for details. <br />Custom fabricated signs require a longer production cycle and may take as long <br />as 4 to 6 weeks or longer depending on the complexity, the quantity of signs <br />ordered, and the scope of the project. If your sign requires permitting, we do <br />not begin fabrication until we have an approved permit from your town's <br />planning department. <br />Past due invoices are subject to a $25 late fee and 1.5% monthly of the <br />outstanding balance. <br />The above-mentioned prices specifications and conditions are satisfactory and are hereby accepted. <br />You are authorized to do all the work specified. Payment will be made as outlined above. <br />Signature:Date: <br />Generated On: 6/21/2024 11:35 AM Page 2 of 2 <br />Each office is independently owned and operated, for more info please go to signarama.com <br />Choose DesignElement for quick turn signs to multi phase developments, digital pylon signs, entry monuments, and more! <br />DocuSign Envelope ID: 261B0FB3-416E-4C99-B64A-A0C4F21655DF
The URL can be used to link to this page
Your browser does not support the video tag.