Browse
Search
2024-340-E-AMS-Brady Services, Inc.-Passmore Center HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-340-E-AMS-Brady Services, Inc.-Passmore Center HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2024 10:07:54 AM
Creation date
7/29/2024 10:07:49 AM
Metadata
Fields
Template:
Contract
Date
6/20/2024
Contract Starting Date
6/20/2024
Contract Ending Date
6/26/2024
Contract Document Type
Contract
Amount
$405,465.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />401 Kitty Hawk Drive, Morrisville, NC 27560 – Tel: 866.328.2764 – bradyservices.com <br />Page 2 of 3 <br />Scope of Work <br />At the Jerry M. Passmore Senior Center, located at 103 Meadowlands Dr, Hillsborough, NC 27278, Brady <br />will perform the following scope of work in accordance with the “Passmore Senior Center HVAC <br />Replacement 95% ME Review Drawing Set” provided by PDC Engineering dated 5.19.2023. <br />1. Demolish and remove RTU-3, RTU-4, RTU-5, RTU-6 and RTU-7. <br />2. Demolish and remove EF-1, EF-2, EF-3 and SF-1. <br />3. Demolish and remove IDU-1. <br />4. Provide (1) 7.5T RTU to replace RTU-3, (2) 10T RTUs to replace RTU-4 and RTU-5, and (2) <br />5T RTUs to replace RTU-6 and RTU-7. <br />5. Provide new EF-1, EF-2, EF-3, SF-1 and IDU-1. <br />6. Provide mechanical installation services required to install new equipment <br />1. Replace existing RTU 3,6,7 with new units <br />2. Furnish and install all supply ductwork and transitions needed to connect the new <br />RTU-4 and RTU-5 to the existing supply air distribution system. <br />3. Furnish and install all return ductwork and transition as needed to connect the new <br />RTU-4 and RTU-5 to the existing ducted air return system. <br />4. Replace EF-1, EF-2, EF-3, SF-1 and IDU-1 with new units. <br />7. Provide electrical installation services required to install new equipment. <br />1. Disconnect existing power wiring. <br />2. Replace service disconnect. <br />3. Replace flexible sealtight conduit and wire from new disconnects and units <br />8. Provide crane and rigging to remove the existing equipment and to install the new <br />equipment <br />9. Provide new curb adapters for each RTU. <br />10. Provide an onsite superintendent and dedicated project manager. <br />11. Provide pre-TAB and post-installation TAB services. <br />12. Remove and re-install existing duct detectors where required. <br />13. Pull all required permits to install the new equipment. <br />14. Payment and performance bonds shall be provided <br />15. Internal commissioning shall be provided, and coordination with the owner’s third-party <br />commissioning agent is included. <br /> <br /> <br />DocuSign Envelope ID: 19E6621B-D4D8-44A4-91A7-513B87CF541C
The URL can be used to link to this page
Your browser does not support the video tag.