Browse
Search
2024-340-E-AMS-Brady Services, Inc.-Passmore Center HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-340-E-AMS-Brady Services, Inc.-Passmore Center HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2024 10:07:54 AM
Creation date
7/29/2024 10:07:49 AM
Metadata
Fields
Template:
Contract
Date
6/20/2024
Contract Starting Date
6/20/2024
Contract Ending Date
6/26/2024
Contract Document Type
Contract
Amount
$405,465.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised 01/24 1 <br />[Departmental Use Only] <br />TITLE Passmore HVAC Replacement <br />FY 2023-2024 RFP RC2022-1001 <br />NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT OVER $250,000.00 <br />ORANGE COUNTY <br />THIS CONSTRUCTION AGREEMENT (hereinafter called “Agreement”), made as of the 19th day of <br />June, 2024, by and between Brady Services, Inc, (hereinafter called the “Contractor”), and Orange County, a <br />political subdivision of the State of North Carolina, (hereinafter called the “County,” “Orange County,” or <br />“Owner”). <br />W I T N E S S E T H: <br />That the Contractor and the Owner, for the consideration herein named, agree as follows: <br />1. CONTRACT DOCUMENTS; PRIORITY <br />The Contract Documents consist of this Agreement, the General Conditions which are fully <br />incorporated in this Agreement, the Request for Proposals, designer approved communications and field <br />orders, the Proposal, Construction Documents and Drawings and Written Specifications. The Contract <br />Documents form the Contract. In the event of any inconsistency between or among the Contract Documents <br />the Contract Documents shall be interpreted in the following order of priority: <br />a. This Agreement and incorporated General Conditions attached as Exhibit 1. <br />b. Designer approved and stamped construction documents and drawings and written <br />specifications. <br />c. Designer approved communications and field orders. <br />d. Request for Proposals and addenda thereto. <br />e. Proposal. <br />2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible <br />for all of the Work required by this Agreement within the time period stipulated in a written Notice-to-Proceed <br />to be executed by the Contractor and Owner and in accordance with the following enumerated documents, <br />which are made a part hereof as if fully contained herein: <br />a. Construction Drawings prepared by Progressive Design Collaborative, LTD (Sheet G0.01, <br />M0.00, M1.01, M2.01, M5.01, M6.01, M7.01, E0.00, E1.01, E2.01, E5.01, E5.02, E6.01 dated <br />May 17, 2024) <br />b. Written specifications prepared by the Designer. <br />c. Brady Services, Inc. proposal dated June 7, 2024 which fully describes the work to be <br />DocuSign Envelope ID: 19E6621B-D4D8-44A4-91A7-513B87CF541C
The URL can be used to link to this page
Your browser does not support the video tag.