Browse
Search
2024-339-E-AMS-Siemens Industry, Inc-Passmore HVAC - Install Controls to new and existing HVAC equipment
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-339-E-AMS-Siemens Industry, Inc-Passmore HVAC - Install Controls to new and existing HVAC equipment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2024 10:07:21 AM
Creation date
7/29/2024 10:07:16 AM
Metadata
Fields
Template:
Contract
Date
6/20/2024
Contract Starting Date
6/20/2024
Contract Ending Date
6/26/2024
Contract Document Type
Contract
Amount
$195,663.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Siemens Industry, Inc. <br />11000 Regency Pkwy - Suite 400E <br />Cary, NC 27518 <br />Tel: 984.920.2604 <br />Fax: 919.469.9846 <br />3 of 4 <br />o (2) EXHAUST FAN – EF-1 and EF-3 <br />▪ Wired back to nearest PXC Control Panel <br />▪ Damper Actuator AO , AI <br />▪ Speed Controller (provided by others) <br />• Start/Stop Relay DO <br />• Speed Signal AO <br />• Status Current Switch DI <br />o (1) EXHAUST FAN – EF-2 <br />▪ Install and wire (1) wall mounted device <br />▪ Exhaust fan to operate standalone (no integration into front-end BAS system) <br />o (1) KITCHEN SUPPLY FAN – SF-1 <br />▪ Install and wire (1) wall mounted device <br />▪ Kitchen supply fan to operate standalone (no integration into front-end BAS system) <br />o (1) Ductless Split System <br />▪ Install and wire (1) wall mounted device <br />▪ Control interlock wiring between IDU and ODU <br />▪ DSS to operate standalone (no integration into front-end BAS system) <br /> <br />Miscellaneous <br />o (QTY 1) Space Temperature Sensor <br />▪ Space Temp Monitoring of Ductless Split System <br />▪ Wired back to nearest PXC or DXR Controller <br /> <br />6. All instrumentation to be Siemens standard products. <br />7. Labor to support Test & Balance contractor (Not to exceed 24 hours). <br />8. Labor to support Commissioning contractor (Not to exceed 40 hours). <br />9. A total of (8) hours Owner training. <br />10. All work to be completed during normal business hours. <br />11. One-year warranty. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />DocuSign Envelope ID: 522A1F12-59F9-4879-B1FB-8D4C2E51F8DE
The URL can be used to link to this page
Your browser does not support the video tag.