Browse
Search
7.24.24 BOA Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2024
>
7.24.24 BOA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 4:59:46 PM
Creation date
7/19/2024 3:59:55 PM
Metadata
Fields
Template:
BOCC
Date
7/24/2024
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 Erwin Road Montessori School Special Use Permit Application – Exhibit C Intended Evidence Exhibit 1: Erwin Road Montessori School Special Use Permit Site Plan <br />- Relevant to UDO Sections 5.3.2 A & B <br />- It demonstrates that the proposed improvements on site will be made to allow for the increased capacity of the <br />daycare.Expert Witness 1: William Wirt, PE – Project Manager at Summit Design and Engineering Services in Hillsborough, NC <br />- Is being offered as an expert in site development and compliance with the UDO sections relevant to the subjectuse.- William possesses specialized knowledge in this field through almost 7 years of experience with design, <br />inspection, and construction administration in areas such as site design, stormwater and erosion control design, <br />private and public roadway design ADA inspection, construction material testing, and permitting through various <br />authorities having jurisdiction, both local and state. <br />- William reviewed and examined the existing permits and licenses that exist for the daycare, the current SUP and <br />related survey provided by Ballentine Associates for Allson Windram on 07-26-2001, the UDO sections relevant <br />to the existing and proposed use, GIS and USGS data and correspondence between the owner and state and <br />county officials. He also conducted a site visit as a means of verification. <br />- William leveraged standard engineering methods for this research, verification, drafting and site visits. <br />- William’s expert opinion relevant to UDO sections 5.8.2 demonstrates that the proposed modification to the <br />existing SUP will comply with the requirements of Orange County UDO for the site functionality (###) of the <br />intended use. <br />67
The URL can be used to link to this page
Your browser does not support the video tag.