Browse
Search
7.24.24 BOA Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2024
>
7.24.24 BOA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 4:59:46 PM
Creation date
7/19/2024 3:59:55 PM
Metadata
Fields
Template:
BOCC
Date
7/24/2024
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit E -Proposed Conditions• <br />The Board of Adjustment must deny the permit if any standard cannot be met either by a <br />showing of evidence or by a condition placed upon the permit. Staff has included the general <br />conditions required for all Special Use Permits, as detailed within the UDO. <br />Please list any proposed conditions which may be necessary for the Board of Adjustment to find <br />that all standards will be met. <br />1. For public safety as required in 5.3.2(8)(2) of the UDO, final assignment of a street address shall be <br />completed by Orange County Land Records prior to the issuance of any permit authorizing land <br />disturbing activity on the property in accordance with the Orange County Addressing Ordinance. <br />2. Per Section 2.5 of the UDO, the applicant shall obtain all necessary development permits from the <br />County prior to the initiation of any land disturbing activity associated with the construction of the <br />proposed use including, but not limited to: Building Permit, Land Disturbance Permit (LOP), Solid <br />Waste Management Permit, and Zoning Compliance Permit. <br />3. In accordance with the provisions of Section 2. 7 .11 (C) of the UDO, if any condition of this Special <br />Use Permit shall be held invalid or void, then this Special Use Permit shall be void in its entirety and <br />of no effect. <br />4. In accordance with the provisions of Section 2.7.11 (D) of the UDO, the Special Use Permit will <br />automatically expire within 12 months from the date of approval if the use has not commenced or <br />construction has not commenced or proceeded unless a timely application for extension of this time <br />limit is approved by the Board of Adjustment. <br />Page 7of9 <br />59
The URL can be used to link to this page
Your browser does not support the video tag.