Orange County NC Website
1 <br />Dan Jewell: That's correct. 2 <br /> 3 <br />Greg Niemiroski: The reconfiguration is not simply reconfiguring it based on the lot size and shape as it was at 4 <br />the time of the last two versions. 5 <br /> 6 <br />Dan Jewell: Correct. We are adding additional properties into the burden of the special use permit and those 7 <br />additional properties will have the conditions on them if you choose to approve our request for a new special use 8 <br />permit. 9 <br /> 10 <br />Nathan Robinson: When I look at this drawing right here this little part is the 25 acres that we're talking about, 11 <br />correct? The one that's etched in green. 12 <br /> 13 <br />Dan Jewell: Yes sir. 14 <br />Nathan Robinson: And then there's brown that you've shown a road to go through, how many acres is this brown 15 <br />lot here? 16 <br /> 17 <br />Dan Jewell: I haven't measured it. By eyeballing it, that's probably a total of another 25 acres. Something like that. 18 <br /> 19 <br />Nathan Robinson: So, this was purchased by the same company, this was purchased by the same ownership? 20 <br /> 21 <br />Dan Jewell: Correct. 22 <br /> 23 <br />Nathan Robinson: Okay. Has it been unified as one property? 24 <br /> 25 <br />Dan Jewell: Yes. 26 <br /> 27 <br />Nathan Robinson: So, it has been unified? So, we know the acreage then, right? 28 <br /> 29 <br />Dan Jewell: It has been recombined, yes. 30 <br /> 31 <br />Eric Chupp: Its 50 acres, the lower portion. 32 <br /> 33 <br />Nathan Robinson: So, we have 25 acres here, and then that lower portion is another 50 acres? 34 <br /> 35 <br />Jeff Scott: 25. 36 <br /> 37 <br />Nathan Robinson: 25. I'm sorry. 38 <br /> 39 <br />Dan Jewell: 50 total. 40 <br /> 41 <br />Nathan Robinson: And then, but then you add this brown property up here. Is this part of the story as well? 42 <br />Because you presented it as part of the story, but you don't present it as part of the story at the same time. 43 <br /> 44 <br />Dan Jewell: No. That was not part of the current special use permit. I don't believe it's part of the current special 45 <br />use permit proposal, but we're showing how we're protecting other areas of the site. But the 25 acres that we're 46 <br />protecting are within the area of the special use permit that we are requesting. 47 <br /> 48 <br />Ben Kuhn: That's just an illustrative specific to what could possibly be built there with the open space and the 49 <br />configuration as it is now. 50 <br />25