Orange County NC Website
Fire and Life <br />Safety Date: Staff: <br />Elizabeth Farnan <br />efarnan@orangecountync.gov <br />919-245-6153 <br />No comments received. <br /> NCDOT Date: Staff: <br />David Genwright <br />digenwright@ncdot.gov <br />336-570-6833 <br />1. Based on the submittals, the structure change is taking place off NCDOT right of way. It <br />also not changing the building use by any notable measure so with that and no proposed <br />utility work, no NCDOT action is required. <br /> Planning Date: Staff: <br />Patrick Mallett <br />pmallett@orangecountync.gov <br />919-245-2577 <br />No comments received. <br /> Solid Waste Date: Staff: <br />Matt Taylor <br />mtaylor@orangecountync.gov <br />919-918-4905 <br />No comments received. <br /> Stormwater <br />Management Date: 7/9/2024 Staff: <br />Christopher Sandt <br />csandt@orangecountync.gov <br />919-245-2583 <br />1. The project is located in the Upper Eno Critical Watershed Overlay District. <br />Stormwater Management is required if proposed Land-Disturbing Activity exceeds <br />21,780 square feet. <br /> Transportation <br />Services Date: 7/8/2024 Staff: <br />Darlene Weaver <br />dweaver@orangecountync.gov <br />919-245-2002 <br />1. No comment <br />222