Browse
Search
7.24.24 BOA Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2024
>
7.24.24 BOA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 4:59:46 PM
Creation date
7/19/2024 3:59:55 PM
Metadata
Fields
Template:
BOCC
Date
7/24/2024
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d.Township: Cedar Grove <br />e.Future Land Use Map Designation: Agricultural Residential <br />(AR) <br />f.Growth Management System Designation: Rural <br />g.Roads: Frontage along Eno Cemetery Rd (SR 1383) <br />h.Water and Sewer Service: The property is not located within a <br />primary utility service area meaning water and sewer service is <br />provided by an individual well and septic system. <br />Surrounding Land Uses: a.NORTH: Property developed for what appears to be residential <br />purposes zoned AR; <br />b.SOUTH: Property developed for what appears to be residential <br />purposes zoned AR; <br />c.EAST: Lake Orange <br />d.WEST: Eno Cemetery Rd (SR 1383) and developed property <br />zoned AR. <br />Proposal: As detailed within Attachment 1, the applicant has applied for a VARIANCE from the <br />150-foot reservoir buffer to allow for the renovation and construction of an addition to the <br />existing nonconforming residential structure +/- 75 ft. from Lake Orange. This variance would <br />provide relief from the normal 150-foot. reservoir buffer, which covers approximately two-thirds <br />of the property. <br />The applicant is proposing to expand and renovate an existing A-frame residential structure on <br />the property, specifically an addition of 16’ by 34’ (544 sq. ft.). The applicant has stated the <br />addition shall be located at the farthest point possible away from the lake while still connected to <br />the original structure. <br />The applicant notes the need for the addition based on the structure’s original A-frame <br />construction, as there are no viable bedroom spaces or ability to meet accessibility needs and <br />various other building code requirements. However, due to setback relationships between <br />house, well, and septic, the applicant states there is no other viable configuration to provide for <br />an addition. <br />All renovations would be required to obtain all proper permitting through Orange County should <br />a Variance be granted. <br />ORDINANCE REQUIREMENTS: <br />Per Section 6.13.4 (c) Minimum Buffer Widths for Watershed Protection Overlay Districts <br />development project(s) within the Upper Eno Critical Area Overlay District are required to <br />adhere to the following buffer requirement(s): <br />a. 80-foot stream buffer, when slopes are greater than 7.5%, applied to the outside of the <br />outside of the Special Flood Hazard Area (100 Year FloodZone) <br />199
The URL can be used to link to this page
Your browser does not support the video tag.